Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 341 decisions within 5 km, 4 exact-site or onsite candidate records, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF AN ALL-WEATHER PITCH INCLUDING PERIMETER FENCING, FLOOD LIGHTING, CAR PARKING AND ASSOCIATED SITE WORKS
CONSTRUCTION OF AN ALL-WEATHER PITCH INCLUDING PERIMETER FENCING, OVERHEAD NETTING, FLOOD LIGHTING, BASKETBALL COURT, CAR PARKING AND ASSOCIATED SITE WORKS
(1) CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE EAST SIDE OF THE EXISTING SCHOOL BUILDING TO CREATE A TWO CLASSROOM SEN UNIT, (2) PROVISION OF A SOFT PLAY SPACE, CONTAINING A SENSORY GARDEN, TO THE SOUTH OF THE EXISTING SCHOOL, (3) PROVISION OF ACCESSIBLE PARKING SPACES AT THE ENTRANCE TO THE NEW SEN UNIT USING EXISTING ENTRANCE OFF REGIONAL ROAD, R-245-20 AND (4) CONNECTION TO EXISTING SERVICES ON SITE AND ALL ANCILLARY SITE WORKS CONNECTED WITH THE WORKS MENTIONED ABOVE. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
EXTENSION TO EXISTING ACCESS ROAD INCLUDING ASSOCIATED SITE WORKS
CONSTRUCTION OF AN EXTENSION TO EXISTING SHOP TO INCLUDE RETAIL AREA, STAFF FACILITIES, GOODS ACCESS, EXTERNAL STORAGE YARD, ADDITIONAL CAR PARKING AND ASSOCIATED SITE WORKS
(1) CONSTRUCTION OF A REAR EXTENSION TO EXISTING DWELLING, TO INCLUDE REVISIONS TO EXISTING FENESTRATION, (2) CONSTRUCTION OF A ONE BEDROOM ANNEX SIDE EXTENSION TO EXISTING DWELLING, TO INCLUDE DEMOLITION OF PREVIOUS MONO-PITCH SIDE EXTENSION, (3) DECOMMISSIONING OF EXISTING SEPTIC TANK AND PROVISION OF NEW WASTE WATER TREATMENT SYSTEM TO SERVICE THE DEVELOPMENT AND (4) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 341 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2461995The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief