Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 758 decisions within 5 km, 2 exact-site or onsite candidate records, and 38 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
38 structured nearby appeal records.
38 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
MODULAR HOME AND PERMISSION FOR (1) CHANGES TO THE MODULAR HOME FAÇADE FINISH, (2) CONNECTION TO A NEW SEWAGE TREATMENT PLANT AND PERCOLATION AREA AND (3) ACCESS TO RIGHT OF WAY, AND ALL ASSOCIATED WORKS AND SITE WORKS
TEMPORARY MODULAR HOME WITH CONNECTION TO TREATMENT PLANT AND POLISHING FILTER ALONG WITH ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A TWO STOREY DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) DEMOLITION OF 33M2 GARAGE, (2) CONSTRUCTION OF A SINGLE STOREY 169M2 EXTENSION TO THE SOUTH, AND (3) ALL ASSOCIATED HARD LANDSCAPING WORKS AND SERVICES
A PERIOD OF 10 YEARS FOR DEVELOPMENT AT THE EXISTING ESB NETWORKS 110KV LETTERKENNY SUBSTATION WHICH WILL CONSIST OF: (1) SOUTHWARD EXTENSION OF THE EXISTING ESB NETWORKS 110KV SUBSTATION COMPOUND BY 0.9HA, (2) CONSTRUCTION OF A 110 KV (KILOVOLT) GAS INSULATED SWITCHGEAR (GIS) BUILDING (APPROXIMATELY 82.5M BY 18.5M) MAXIMUM HEIGHT 18.0M, TO REPLACE THE EXISTING 110KV AIR INSULATED SWITCHGEAR (AIS) SUBSTATION, (3) CONSTRUCTION OF 5 NO. 110 KV LINE CABLE INTERFACE MASTS (LCIMS) TO THE SOUTH AND SOUTH-WEST OF THE EXISTING AIS SUBSTATION COMPOUND AND PROPOSED REPLACEMENT GIS BUILDING, WHICH WILL COMPRISE THE END POINT OF THE EXISTING OVERHEAD LINE CIRCUITS ACCESSING THE PROPOSED GIS BUILDING, (4) CONNECTION OF EXISTING TRANSMISSION CIRCUITS TO THE PROPOSED GIS BUILDING BY WAY OF UNDERGROUND CABLES FROM THE NEW LCIMS, (5) DECOMMISSIONING AND REMOVAL OF 7 NO. EXISTING 110 KV TOWERS AND 3 NO. 110KV H POLES, CABLING, BUSBARS, SWITCHGEARS AND SUPPORT STRUCTURES, (6) ERECTION OF 3 NO. LIGHTNING MASTS AT 11M HIGH AT THE REPLACEMENT GIS COMPOUND, (7) TEMPORARY WIDENING (31M) OF THE EXISTING (4M) FIELD GATE ENTRANCE OFF THE L1054 TO FACILITATE A TEMPORARY CONSTRUCTION ACCESS TRACK (204M), PERMANENT ACCESS TO THE DEVELOPMENT WILL CONTINUE AS EXISTING FROM THE SUBSTATION ENTRANCE OFF THE N13 AND (8) ALL ASSOCIATED AND ANCILLARY WORKS, INCLUDING ASSOCIATED GROUND CABLING AND EARTHGRID, 5 NO. CAR PARKING SPACES, SURFACE WATER DRAINAGE, UNDERGROUND WASTEWATER STORAGE TANK, LIGHTING, LANDSCAPING AND BOUNDARY TREATMENT, SITE PREPARATION, SITE CLEARANCE AND LEVELLING, PROVISION OF HARDSTANDING, PERMANENT INTERNAL ACCESS ROAD (505M), 1 NO. TEMPORARY CONSTRUCTION COMPOUND AND 1 NO. TEMPORARY LAYDOWN AREA WITH 20 NO. TEMPORARY CAR PARKING SPACES AND ALL ANCILLARY WORKS, ON AN OVERALL SITE AREA OF 9.3HA. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
CONSTRUCTION OF AN ELECTRICITY STORAGE FACILITY COMPRISING OF A BATTERY ENERGY STORAGE SYSTEM (BESS), WITHIN A TOTAL SITE AREA OF UP TO 6.1HA TO INCLUDE ONE ELECTRICAL COMPOUNT, ELECTRICAL TRANSFORMER/INVERTER STATION MODULES, BATTERY STORAGE ENCLOSURES (BSES), POWER CONVERSION SYSTEMS ON CONCRETE SUPPORT STRUCTURES, ATTENUATION PONDS, INDICATIVE 110KV BURIED IMPORT/EXPORT CABLE AND INDICATIVE 110KV SUBSTATION TO FACILITATE CONNECTION TO THE EXISTING 110KV LETTERKENNY SUBSTATION, UPGRADED ACCESS TRACKS, CRANE HARDSTANDING, ASSOCIATED ELECTRICAL DUCTING, PALISADE SECURITY FENCING AND CCTV SYSTEM, LANDSCAPING WORKS, LIGHTING POLES AND ALL OTHER ANCILLARY AND MISCELLANEOUS SITE WORKS INCLUDING CLEARANCE. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
The brief summarizes the pattern across all 758 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2462087The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief