Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 230 decisions within 5 km, 2 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF GRANNY FLAT EXTENSION WITH GARAGE/STORE OUTHOUSE TO THE NORTH-WEST SIDE OF EXISTING DWELLING WITH ASSOCIATED DRAINAGE AND SITE WORKS
(1) DOMESTIC STORAGE SHED/BOAT STORAGE & ACCESS LANE (2) BORED WATER WELL IN LIEU OF MAINS WATER CONNECTION (3) RELOCATION OF SEWERAGE TREATMENT SYSTEM FROM THAT PREVIOUSLY GRANTED UNDER PLANNING REF 01/2326 AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS
(1) SINGLE STOREY SUN-ROOM EXTENSION BUILT TO NORTH GABLE OF EXISTING DWELLING, (2) PRIVATE DOMESTIC GARAGE EXTENSION BUILT TO SOUTH GABLE OF EXISTING DWELLING AND (3) PART ROOF-ATTIC DEVELOPMENT INTO PRIVATE DOMESTIC ACCOMODATION WITH WINDOW ON SOUTH GABLE OF EXISTING DWELLING
DORMER DWELLING HOUSE, FOUL SEWER TREATMENT PLANT AND ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDNG ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 230 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2550148The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief