Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 127 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission to construct a single storey dwelling house and domestic waste water treatment system on site, together with all ancillary site works and services at
To construct a proposed new 732 square metre industrial unit, proprietary effluent treatment system and soil polishing filter, complete with all associated works at
Permission for the following: (1) Construction of a new domestic garage with all associated site works at
Permission for the following: (1) Construction of a new detached dwelling house; (2) Proposed effluent treatment system and percolation area with all associated site works at
Permission is sought for Grid System Services Limited, applying for a 10 year permission to develop an Energy Storage System, which will connect to the nearby ESB Tonroe 110kV Electricity Substation on land at Ballyoughter, Ballaghaderreen, County Roscommon. The proposed development will have a projected life span of 35 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c.2.33 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 44 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); up to 11 transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure at
For the development of a grid system service facility within a total site area of up to 0.55 hectares, to include 1 no. single storey electrical substation building, 1 no. customer switchgear container, 15 no. electrical inverter/transformer station modules (SKIDS) 10 no. containerised battery storage modules on concrete support structures, 20 no. heating, ventilation and air conditioning units (HVAC units) access tracks and upgraded site entrance, associated electrical cabling an ducting, security gates, perimeter security fencing, CCTV security monitoring system, culvert, landscaping works and all associated ancillary infrastructure on land at
The brief summarizes the pattern across all 127 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560444The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief