Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 420 decisions within 5 km, 1 exact-site or onsite candidate record, and 29 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Meath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Meath County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Meath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
29 structured nearby appeal records.
29 matchedCitations are current-dated and carry policy name, section, page and source URL from the Meath County Council development plan.
1 matchedOpen preview
Open preview
The development will consist of demolition of elements of the existing dwelling and the provision of a new 2-storey extension to the east of the existing dwelling, internal and external alterations and refurbishment works to the existing dwelling including the building up of the gables with matching stonework (previously a hipped roof) and a new wastewater treatment system and percolation area together with all associated site development works.
Permission for the demolition of existing storey and a half dwelling and to replace same with the construction of a storey and a half dwelling, wastewater treatment system with polishing filter, amended entrance, revised site boundaries and all ancillary site works *Significant Further Information Received on 23/05/2025*
Permission for the construction of a single storey garage, store and dog kennel and for associated siteworks *Further information received on 27.2.24**
Permission for the construction of a domestic shed for the storage of a camper van along with any ancillary site works
Permission to construct two-storey dwelling, domestic garage and all site development works incl. new effluent treatment system and access to public roadway. Permission is also sought for field access and lane to serve remaining lands. **SIGNIFICANT FURTHER INFORMATION RECEIVED 24/01/2018 provides for, inter alia, retention of existing entrance to public roadway approved under 06/387 and retention of infill of land to the rear of the site.
Retention permission for development that will consist of existing partially constructed dwellinghouse and existing associated site works and the permission will consist of completion of construction of existing dwellinghouse waste water treatment system and percolation area and all associated site works all of above as under previous permission ref no 08809 and ref no 13127. *Further Information received on 10/01/2022*
The brief summarizes the pattern across all 420 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2561267The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief