Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Mackney Brackernagh(Clancarty) , Site A involves lands to the north east of Junction 15 on the M6 (east of Garbally Roundabout) , Site B involves lands to the east of the R446Opens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Mackney Brackernagh(Clancarty) , Site A involves lands to the north east of Junction 15 on the M6 (east of Garbally Roundabout) , Site B involves lands to the east of the R446

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

17% of nearby decided applications were refused. The site check found 313 decisions within 5 km, 1 exact-site or onsite candidate record, and 15 structured appeals.

Matched source
2561304
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.

1 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

15 structured nearby appeal records.

15 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

313Nearby applications
1Site-linked candidates
17%Nearby refused
15Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

2561304

For Site A involving lands to the north east of Junction 15 on the M6 (east of Garbally Roundabout) and site B involving lands to the east of the R446, at an existing service station (Mackney, Ballinasloe). The proposed development will consist of: Site A (3.98ha) Provision of new electric vehicle charging hub for 36 vehicles (all under canopy measuring 3.22m high and including solar panels over) along with 4 no. EV HGV charging spaces (no canopy). Construction of single storey service station building (1,018.66sq.m) including net retail area of 100sq.m (excluding off-licence), 2 no. food offers, seating area, drive-thru hatch for one of the food offers, coffee dock, toilets, back of house area, along with external storage yard, outdoor play area and outdoor seating area. The maximum height is 11.08m high. All ancillary development including fuel pumps under canopy (5.6m high), underground tanks, vent pipes, HGV fuel pumps (6.7m high), new vehicular entrance off Garbally roundabout, new roundabout junction which will also facilitate future access to the lands to the north, car parking (83 – including staff, family and accessible spaces), cycle parking (16 no. spaces), HGV/Bus parking (13 no. – including 4 no. EV parking spaces), motor cycle spaces (5 no. spaces), drainage infrastructure (including SuDs measures), boundary treatments, hard and soft landscaping (including attenuation pond and bio-retention pond), internal roads, footpaths, dedicated active travel route along the northern boundary of the site from the east to west of the site, outdoor exercise and areas, outdoor picnic areas, brush and jet wash, single storey car wash plant building (12.5sq.m), roof mounted solar panels, signage (free standing [including totem sign] and on-building), single storey bin store (67.5sq.m), single storey substation building (38.23sq.m) and lighting. All associated site and drainage works. Site B (0.19ha) It is proposed to demolish all structures relating to the fuel element of the existing filling station (the fuel pumps, canopy, totem sign) and underground fuel tanks. The existing buildings containing the shop and storage will remain in situ. The car wash facility will be discontinued. A Natura Impact Statement is included with the application.

Granted0.0 km30 June 2026
212335

To construct a first floor extension (19.75 sqm) to the side of existing dwelling house & for retention permission for existing domestic garage (56 sqm). Gross floor space of proposed works: 19.75 sqm. Gross floor space to be retained: 216 sqm

Granted0.2 km10 February 2022
23100

To construct a single storey extension (9 sqm) to the front and a part two storey/part single storey extension (47 sqm) to the rear of the existing two-storey semi-detached dwelling, replacement of existing windows and entrance door. Gross floor space of proposed works: 45 sqm

Granted0.2 km10 May 2023
2560057

For the construction of 1 no. storage room, 1 no. laundry room, 1 no. porch and for the conversion of an integral garage with tools' room and boiler room into a bedroom/sensory room and en-suite

Granted0.3 km04 March 2025
2361

For the construction of a domestic garage and all associated site works. Gross floor space of proposed works: 53.88 sqm

Granted0.3 km19 April 2023
2560930

Of an existing single storey dwellinghouse. Gross floor space of work to be retained: 112.75 sqm

Granted0.3 km04 September 2025

The brief summarizes the pattern across all 313 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required