Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
23% of nearby decided applications were refused. The site check found 190 decisions within 5 km, 4 exact-site or onsite candidate records, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a detached, part single/ part two-storey dwelling, a detached garage, the provision of a new shared vehicular entrance and driveway; and the provision of all other associated site excavation, infrastructural and site development works above and below ground, including wastewater treatment system and percolation area
Construction of a detached, part single/ part two-storey dwelling, a detached garage, the provision of a new shared vehicular entrance and driveway; and the provision of all other associated site excavation, infrastructural and site development works above and below ground, including wastewater treatment system and percolation area
For construction of a detached, part single/part two storey dwelling, a detached garage, the provision of a new vehicular entrance and driveway; and the provision of all other associated site excavation, infrastructure, and site development works above and below ground, including wastewater treatment system and percolation area
Retention Permission for; a) changes to layout of a portion of storage yard permitted by planning references 19/948, 22/1158 and 23/60313 b) relocation of wastewater treatment system and polishing filter previously permitted by planning reference 22/1158. c) new petrol / oil interceptors and associated silt traps d) attenuation/infiltration pond, e) new boundary treatments, and Permission for; f) extension to existing machinery repairs workshop, g) change of use of agricultural lands to new storage yard, h) new retaining walls i) new access ramp j) new wash bay area k) new wash bay storage shed l) new storage bays and associated concrete apron m) all other associated site development works
The development will consist of: Material alterations to previously approved development Pl. Ref. 22/1158. The proposed changes include: a. An increase in building height by 1.770 meters from 8 to 9.770 meters. b. Increase in Ground Floor Level by.275 meters and First Floor Level by.885 meters. c. Internal alterations. d. Changes to External Elevations to include the redesign of building façade and main entrance. e. Company signage located at existing entrance to premises.
The development will consist of a single storey extension to the side and rear of an existing two storey office/machinery repair building permitted by PI Ref. 06/151, and all ancillary site development works including revisions to the site boundaries. The extension will be used for the maintenance and repair of the company’s vehicles
The brief summarizes the pattern across all 190 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561401The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief