Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 799 decisions within 5 km, 2 exact-site or onsite candidate records, and 34 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedNo zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.
One current citation from the Donegal County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
34 structured nearby appeal records.
34 matchedCitations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.
1 matchedOpen preview
Open preview
ERECTION OF A DWELLING AND DETACHED GARAGE WITH WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA, CONNECTION TO EXISTING SERVICES, AND ALL ASSOCIATED WORKS
ERECTION OF A DWELLING WITH WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA, CONNECTION TO EXISTING SERVICES, AND ALL ASSOCIATED WORKS
A TEN-YEAR PLANNING PERMISSION FOR DEVELOPMENT AT THE EXISTING BUNCRANA WASTEWATER TREATMENT PLANT (WWTP) LOCATED AT RAILWAY ROAD, BALLYMACARRY LOWER, CO. DONEGAL; THE EXISTING FAHAN WWTP LOCATED AT CARRONTLIEVE, FAHAN, CO. DONEGAL; AND ALONG THE R238 REGIONAL ROAD WITHIN THE TOWNLANDS OF CARRONTLIEVE, CARROWMULLIN, FIGARY, LISFANNAN, LUDDAN, AND BALLYMACARRY LOWER. THE PROPOSED DEVELOPMENT WILL CONSIST OF: (1) UPGRADE WORKS TO THE EXISTING BUNCRANA WWTP REQUIRING AN EXPANSION OF THE EXISTING SITE TO INCREASE ITS DESIGN POPULATION EQUIVALENT (PE) FROM 13,200PE TO 17,700PE COMPRISING (A) CONSTRUCTION OF A SECONDARY TREATMENT TANK, BLOWERS AND SOUND ATTENUATION BARRIER, PUMP SUMP AND VENT STACK, FLOW METER CHAMBER, VALVE CHAMBER, ADMINISTRATION BUILDING, FLOOD PROTECTION WALL, 2 NO. PICKET FENCE THICKENER TANKS, A SITE DRAINAGE PUMPING STATION, INTERNAL SITE ACCESS ROAD, INTERCONNECTING PIPEWORK AND MANHOLES AND 4 NO. PARKING SPACES, (B) INTERNAL UPGRADES TO THE INLET WORKS BUILDING, INTERNAL UPGRADES TO THE CONTROL AND SLUDGE DEWATERING BUILDING, INTERNAL UPGRADES TO THE OUTFALL PUMPING STATION, REPURPOSING OF THE PRIMARY SETTLEMENT TANKS AS FINAL EFFLUENT BALANCING TANKS, RECONFIGURATION OF THE FLOW DISTRIBUTION CHAMBER AND INTERNAL UPGRADES TO THE SLUDGE HOLDING TANK, (C) REPLACEMENT OF THE EXISTING SITE ACCESS GATE WITH A PALISADE SECURITY GATE, (D) INSTALLATION OF ROOF MOUNTED SOLAR PHOTOVOLTAIC (PV) PANELS ON SOUTH FACING ROOFS OF THE EXISTING INLET WORKS, CONTROL AND SLUDGE DEWATERING AND PROPOSED ADMINISTRATION BUILDINGS, (E) DECOMMISSIONING AND DEMOLITION OF THE EXISTING SITE DRAINAGE PUMPING STATION, GAS HOLDING TANK, PICKET FENCE THICKENER AND SLUDGE DIGESTION TANK AND (F) ALL HARD AND SOFT LANDSCAPING WORKS INCLUDING SCREEN PLANTING AND ALL ASSOCIATED ANCILLARY WORKS INCLUDING SITE WORKS AND TEMPORARY WORKING AREAS, (2) UPGRADE WORKS TO THE EXISTING FAHAN WWTP TO CONVERT IT INTO A WASTEWATER PUMPING STATION (WWPS) COMPRISING (A) CONSTRUCTION OF A STORMWATER HOLDING TANK, PUMP SUMP AND VENT STACK, VALVE CHAMBER, INLET FLUME, SURGE VESSEL, WET KIOSK, 2 NO. CONTROL KIOSKS, CHEMICAL SKID, BUNDED CHEMICAL STORAGE TANK, EMERGENCY SHOWER, WELFARE UNIT, FLOOD PROTECTION WALL WITH GATE, INTERCONNECTING PIPEWORK AND MANHOLES, (B) DECOMMISSIONING AND DEMOLITION OF THE SITE GATE AND WING WALLS, SEPTIC TANK AND PRELIMINARY EQUIPMENT, (C) MATERIAL ALTERATION OF THE EXISTING SITE ACCESS TO INCORPORATE A NEW AND REALIGNED SECURITY MESH SITE GATE AND WINGWALLS AN
ERECTION OF A DWELLING AND ATTACHED GARAGE, INSTALLATION OF WASTEWATER TREATMENT SYSTEM & PERCOLATION AREA AND ALL ASSOCIATED WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
CONSTRUCTION OF A DWELLING HOUSE AND DOMESTIC OUTBUILDING WITH ALL ASSOCIATED WORKS AND CONNECTION TO SERVICES
RENOVATION AND CONSTRUCTION OF EXTENSION TO EXISTING DERELICT COTTAGE DWELLING TOGETHER WITH INSTALLATION OF ON-SITE SEWAGE SYSTEM AND ALL ASSOCIATED WORKS
The brief summarizes the pattern across all 799 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2561522The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief