Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 426 decisions within 5 km, 2 exact-site or onsite candidate records, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A DWELLING HOUSE WITH DOMESTIC GARAGE AND AN ON-SITE SEWAGE TREATMENT SYSTEM
CONSTRUCTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH WASTEWATER TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH CONNECTION TO PROPOSED SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED WORKS
CONSTRUCTION OF A DWELLING HOUSE AND SEWAGE TREATMENT PLANT
(1) REMOVAL OF EXISTING TOILETS TO SOUTHERN ELEVATION (2) CONSTRUCTION OF EXTENSION TO INCORPORATE A CAFÉ/LOUNGE WITH NEW TOILET FACILITIES TO THE SOUTHERN ELEVATION (3) INSTALL 5 NO ELECTRICAL CHARGING POINTS AND (4) EXTENSION TO ONSITE CAR PARKING PROVISION (5) RELOCATION OF OIL STORAGE TANK (6) DECOMMISSION OF EXISTING SEPTIC TANK SYSTEM AND INSTALLATION OF NEW TREATMENT SYSTEM WITH DRIP DISPERSAL PERCOLATION SYSTEM AND ALL ASSOCIATED SITE WORKS TO EXISTING SHOP AND SERVICE STATION
ERECTION OF A DWELLING HOUSE AND WASTE WATER TREATMENT SYSTEM INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 426 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561609The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief