Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 265 decisions within 5 km, 1 exact-site or onsite candidate record, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured), and a bio-based fertiliser from organic material. The development is a renewable energy development which is covered by the provisions of the Renewable Energy Directive III. The development will consist of the following: Demolition and site clearance works including the removal of an existing shed and adjacent hard standing areas and tank structure, located centrally on the site. Construction of 2 no. primary digesters, a pump house, and 2 no. post digester tanks, located in the northwestern section of the site. Construction of 2 no. prepits, a pasteurisation buffer tank, and a pasteurisation unit, located to south of the primary digesters, within the western section of the site. Construction of a digestate storage tank located centrally on site, to the southeast of the primary and post digester tanks. Construction of a digestate treatment building and a feedstock reception building with an odour abatement system, located in the southwestern section of site. Construction of combined heat and power (CHP) unit, a biogas boiler, a backup boiler, and a gas treatment system, located in the southeast section of the site. Construction of a CO2 liquefactor and an emergency/ safety flare a grid injection unit, a fuel storage tank and a propane tank compound accommodating 2 no. propane tanks, located in the southern section of the site. Construction of roofed silage clamps located centrally on site. Construction of a two storey office building and an ESB substation within the eastern section of the site, adjacent to the site entrance. Alterations to the adjacent local road frontage including improved access arrangements and boundary setback to allow for improved access and safety. Associated and ancillary works including parking (8 no. standard, 3 no. EV and 1 no. accessible parking spaces and bike storage for 12 no. bikes), a weighbridge, solar PV arrays at roof level, wastewater treatment equipment, bunding and surface treatments, attenuation pond, boundary treatments, lighting, services, drainage, landscaping, and all associated and ancillary works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted with this planning application. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development. This development is covered by the provis
To construct a new shed for storage of pitch maintenance equipment and associated site works at the rugby club grounds. Gross floor space of proposed works: 96 sqm
For the construction of a Slatted and Loose Bedded Cattle Shed, Roofed manure Pit and Ancillary Concrete.Gross floor space of proposed works 544.00sqm.
For a new dwelling house, domestic garage, wastewater treatment system, percolation area and all associated site works and services. Gross floor space of proposed works: 232.00 sqm(H), 50 sqm(G)
To construct a dwelling house and domestic garage, to install a treatment system and percolation area and to upgrade the existing water connect to the Clontuskert Group Water Scheme from agricultural to domestic and all associated site works. Gross floor space of proposed works: (House) 199 sqm, (Garage) 72 sqm
To construct a dwelling house with a domestic garage attached, to install a treatment system and percolation area and to upgrade the existing water connection to the Clontuskert Group Water Scheme from agricultural to domestic and all associated site works. Gross floor space of proposed works, 258sqm.
The brief summarizes the pattern across all 265 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561691The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief