Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 317 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedNo zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.
One current citation from the Donegal County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedCitations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.
1 matchedOpen preview
Open preview
ALTERATIONS TO DWELLING HOUSE INCLUDING: (1) 2 NO. 2 STOREY BAY WINDOWS AND (2) FIRST FLOOR VERANDA WITH SUPPORTING PILLARS TO THE FRONT (EAST FACING) ELEVATION AND ASSOCIATED SITE DEVELOPMENT WORKS
RETENTION AND COMPLETION OF EXTENSION UNDER CONSTRUCTION TO EXISTING DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS
RETENTION AND COMPLETION OF EXTENSION UNDER CONSTRUCTION TO EXISTING DWELLING HOUSE
REMOVAL OF THE EXISTING PERMITTED 20M TELECOMMUNICATIONS SUPPORT STRUCTURE AND ASSOCIATED EQUIPMENT AND ERECTION OF A NEW 30M MULTI-USER TELECOMMUNICATIONS SUPPORT STRUCTURE CARRYING 3NO. ANTENNAS AND 1 NO. COMMUNICATION DISH RELOCATED FROM THE REMOVED 20M TELECOMMUNCATIONS SUPPORT STRUCTURE AND 9NO. NEW ANTENNAS AND ASSOCIATED REMOTE RADIO UNITS, 3NO NEW COMMUNICATION DISHES AND 11 NO. NEW OUTDOOR CABINETS AND ASSOCIATED SITE WORKS ALL ENCLOSED WITHIN THE EXISTING PERMITTED SECURITY COMPOUND AND ACCESSD BY A NEW 2M ACCESS GATE TO REPLACE THE EXISTING PERMITTED 3.1M ACCESS GATE AT COILLTE FOREST, MILTOWN. THE DEVELOPMENT WILL PROVIDE VOICE AND MOBILE BROADBAND SERVICES IN THE AREA
(1) DEMOLITION OF EXISTING REAR EXTENSION AND NEW REAR EXTENSION TO EXISTING FARM COTTAGE, (2) DEMOLITION OF EXISTING OUTSHED TO SIDE OF EXISTING FARM COTTAGE AND NEW SUN ROOM TO SIDE OF EXISTING FARM COTTAGE AND (3) INCREASE IN ROOF AND RIDGE HEIGHT TO FORM NEW LIVING ACCOMMODATION TO FIRST FLOOR LEVEL OF EXISTING FARM COTTAGE, AND CONNECTION TO EXISTING SEWAGE TREATMENT PLANT AND ALL ASSOCIATED SITE WORKS
RETENTION FOR DEMOLITION AND RECONSTRUCTION OF SIDE (NORTHERN) GABLE WALL OF COTTAGE, INCLUDING NEW WINDOW AND DOOR OPENINGS AND PERMISSION FOR COMPLETION WORKS TO INCLUDE CONSTRUCTION OF A LARGE DORMER TO THE REAR ROOF OF THE COTTAGE INCLUDING ALL NECESSARY RENOVATIONS / ALTERATIONS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS, IN LIEU OF THAT PREVIOUSLY PERMITTED UNDER PLANNING PERMISSION REF. NO. 24/62127
The brief summarizes the pattern across all 317 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2561706The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief