Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 273 decisions within 5 km, 6 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the construction of a new dwelling house, domestic garage, sewage treatment system and all associated site development works. Gross floor space of proposed works: 244.54 sqm.
For change of house design to that previously granted under 20/1950
For the construction of a new dwelling house, domestic garage, sewage treatment system and all associated site development works. Gross floor space of proposed works: 244.54 sqm.
For the construction of a new dwelling house, domestic garage, sewage treatment system and all associated site development works. Gross floor space of proposed works: 279.3 sqm (House - 230.7 sqm, Garage - 48.6 sqm)
For construction of a new dwelling house, domestic garage, sewage treatment system and all associated site development works. Gross floor space of proposed works: 279.3 sqm
For the construction of a new dwelling house, domestic garage, sewage treatment system and all associated site development works. Gross floor space of proposed works: 293.6 sqm (House - 245 sqm, Garage - 46.8 sqm)
The brief summarizes the pattern across all 273 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561721The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief