Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 398 decisions within 5 km, 2 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF A STANDALONE BUILDING TO INCLUDE A WC AND MEETING ROOM AND ALL ASSOCIATED SITE WORKS
CHANGE OF USE OF EXISTING OUTHOUSE TO DOMESTIC DWELLING AND RENOVATION OF SAME WITH CONNECTION TO MAIN SEWER SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
DEMOLITION OF EXISTING DWELLING HOUSE AND OUTBUILDING AND CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE, DOMESTIC GARAGE AND ASSOCIATED SITE DEVELOPMENT WORKS
(1) CONSTRUCTION OF NEW DETACHED SPECIAL EDUCATION NEEDS ACCOMMODATION WITH SENSORY GARDEN AND SOFT PLAY AREA WITH PERIMETER GUARDING, (2) CONVERSION OF AN EXISTING STORE TO PROVIDE NEW ACCESS LINK WITH EXTERNAL DOOR TO PROVIDE LINKAGE TO THE NEW BUILDING, (3) PROVISION OF ADDITIONAL CARPARKING SPACES AND (4) CONNECTION TO EXISTING FOUL AND SURFACE WATER DRAINAGE AND ALL ASSOCIATED SITE WORKS INCLUDING RETAINING WALLS, LIGHTING ETC.
CAMPUS ENERGY UPGRADE AND REFURBISHMENT WORKS TO BUILDING BLOCK 5 TO INCLUDE: (1) OVERCLAD THE EXISTING BRICK FACADE WITH EXTERNAL WALL INSULATION TO A SELECTED COLOUR, (2) REMOVAL OF THE EXISTING BRICK PIERS AROUND THE BUILDING PERIMETER, (3) REPLACEMENT OF THE EXISTING PITCHED ROOF FINISHES, (4) REPLACEMENT OF ALL EXISTING WINDOWS AND DOORS, (5) INSTALLATION OF A 6KW PV ARRAY ON THE EXISTING FLAT ROOF, (6) PROVISION OF A CONTAINERISED BIOMASS PLAN ROOM WITH FLUE, FUEL STORE AND ASSOCIATED FENCED COMPOUND TO SERVE THE EXISTING SCHOOL BUILDINGS AND (7) ALL ASSOCIATED SITE WORKS
ERECTION OF A TWO STOREY REAR EXTENSION TO EXISTING END TERRACE DWELLING, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS
The brief summarizes the pattern across all 398 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561733The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief