Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
19% of nearby decided applications were refused. The site check found 498 decisions within 5 km, 2 exact-site or onsite candidate records, and 25 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
25 structured nearby appeal records.
25 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For alterations and additions to the existing dwelling and stone shed, including the construction of a new side extension with connecting entrance link, the demolition of the existing shed, the provision of a new wastewater treatment system and all other ancillary site development and associated works
For the 1) construction of a new machinery storage shed, 2) demolition of existing substandard sheds & 3) the widening of the existing access gate as well as all associated site works and ancillary services
To adapt the existing bungalow to a dormer type house by extending upwards and amending façade and including extensions to the rear and side of the existing house. Proposals include upgrade works to existing onsite wastewater treatment and road access amendment. A detached garage is also proposed. Gross floor space of existing building: 150 sqm. Gross floor space of proposed works: 98.4 sqm
To construct a new dwelling house, wastewater treatment system, and domestic garage, with all associated site works. Gross floor space of proposed works: 173.00 sqm(house) & 40.50 sqm(garage)
For dwelling house, garage, on site wastewater treatment/percolation and all associated services. Gross floor space of proposed works: (House) 243 sqm & (Garage) 30 sqm
To construct dwellinghouse, domestic garage, wastewater treatment unit and all associated services (gross floor space dwelling 251sqm; garage 60sqm)
The brief summarizes the pattern across all 498 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561826The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief