Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 262 decisions within 5 km, 2 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
TEMPORARY STORAGE OF ENGINEERING PARTS AND COMPONENTS AND PERMISSION FOR (1) SITE LEVELLING AND RAISING OF GROUND LEVELS USING EXCAVATED MATERIAL AND IMPORTED SOIL AND STONE FILL, (2) CONTINUATION OF TEMPORARY STORAGE OF ENGINEERING PARTS AND COMPONENTS AND (3) ERECTION OF PERIMETER SITE BOUNDARY FENCE AND GATE
FURTHER DEPOSITION OF EXCAVATED MATERIAL
(1) SITE WORKS INCLUDING REDUCED LEVEL EXCAVATIONS TO PROVIDE SUITABLE LEVELS FOR THE BUILDING, VEHICULAR ACCESS & CIRCULATION, CAR PARKING & YARD. THE EXCAVATION WORK MAY NECESSITATE ROCK BREAKING USING A CONTROLLED BLASTING TECHNIQUE IN CONJUNCTION WITH MECHANICAL ROCK BREAKING ACTIVITY. (2) CONSTRUCTION OF A NEW FISH PROCESSING FACILITY WITH ASSOCIATED OFFICES, LABORATORIES, PLANT, EQUIPMENT, COLD STORAGE, PRODUCT STORAGE, STAFF CHANGING & REST ROOMS. THE FACILITY WILL PROCESS UP TO 50,000 TONNES OF FISH PER ANNUM PRODUCING HIGH END PROTEINS, OILS AND CALCIUM FOR DESPATCH AS FOOD INGREDIENTS. CONSTRUCTION WORK WILL INCLUDE A DETACHED 30M HIGH CYLINDRICAL DRIER BUILDING, CHIMNEY STACK AND OTHER ASSOCIATED ITEMS OF PLANT & EQUIPMENT OUTSIDE THE MAIN BUILDING ENVELOPE. AN ENVIRONMENTAL IMPACT STATEMENT AND A NATURA IMPACT STATEMENT HAVE BEEN SUBMITTED WITH THE APPLICATION. THE APPLICATION RELATES TO A DEVELOPMENT WHICH IS FOR AN ACTIVITY REQUIRING AN INDUSTRIAL EMISSIONS LICENCE UNDER CLASS 7.8 (A) (I) OF THE NEW FIRST SCHEDULE TO THE EPA ACT AS AMENDED
EXTENSIONS TO EXISTING FISH PROCESSING FACILITY CONSISTING OF COLD STORAGE, FREEZERS AND GENERAL PRODUCTION AREAS
GROUNDWORKS COMPLETED ON SITE AND PERMISSION FOR ERECTION OF A DRY GOODS STORE INCLUDING TOILET WITH CONNECTION TO MAINS SEWER INCLUDING ALL ASSOCIATED SITE WORKS
ERECTION OF STEEL DOMESTIC SHED TO FRONT OF EXISTING DWELLING HOUSE
The brief summarizes the pattern across all 262 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561829The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief