Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 293 decisions within 5 km, 1 exact-site or onsite candidate record, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
RENOVATION, REFURBISHMENT AND CONSTRUCTION OF EXTENSION TO EXISTING FIRE DAMAGED DWELLING HOUSE CONSISTING OF NEW STOREY AND A HALF LIVING ACCOMMODATION DWELLING HOUSE WITH CONNECTION TO EXISTING SERVICES
(1) ALTERATIONS AND RENOVATIONS TO THE EXISTING DWELLING TO INCLUDED DEMOLITION OF EXISTING REAR EXTENSION AND ELEVATIONAL CHANGES (2)CONSTRUCTION OF A NEW PART SINGLE STOREY PART ONE AND A HALF STOREY REAR EXTENSION (3) PART DEMOLITION OF EXISTING GARAGE/STORE WITH RENOVATIONS TO THE REMAINING STRUCTURE (4) INSTALLATION OF A NEW REPLACEMENT WASTE WATER TREATMENT SYSTEM WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A NEW TWO STOREY DWELLING HOUSE, INSTALLATION OF A FOUL WASTEWATER SYSTEM AND ASSOCIATED PERCOLATION AREA WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
DEMOLITION OF EXISTING FAMILY HOME THAT HAS DEFECTIVE BLOCK WORK AND ERECTION OF A NEW REPLACEMENT DWELLING HOUSE INCLUDING CONNECTION TO EXISTING SERVICES AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF A DWELLING HOUSE, DOMESTIC GARAGE AND PROVISION OF A SEPTIC TANK
MATERIAL AMENDMENT TO THE PROPOSED REPLACEMENT HOUSE PREVIOUSLY GRANTED UNDER PLANNING PERMISSION REFERENCE NO. 21/52100. THE AMENDMENTS INCLUDE CHANGES TO THE ELEVATIONS AND FLOOR LAYOUTS (PERMITTED PLANNING REFERENCE NO. 21/52100 INCLUDED FOR THE DEMOLITION OF THE EXISTING TWO STOREY DWELLING HOUSE DAMAGED DUE TO DEFECTIVE PRECAST CONCRETE BLOCKS AND RECONSTRUCTION OF A NEW REPLACEMENT TWO STOREY DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS. THE RELEVANT ASSOCIATED REPLACEMENT WORKS WILL BE CONNECTED TO EXISTING SITE SERVICES)
The brief summarizes the pattern across all 293 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561927The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief