Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 290 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH ON-SITE WASTEWATER TREATMENT PLANT AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
(1) ALTERATIONS AND EXTENSION TO THE EXISTING DWELLING, (2) CHANGE USE OF DETACHED GARAGE TO PROVIDE TWO ADDITIONAL BEDROOMS AS ANCILLARY ACCOMMODATION TO MAIN DWELLING, (3) DECOMMISSIONING OF THE EXISTING SEPTIC TANK AND (4) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM & ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF AN ECO-TOURISM DEVELOPMENT CONSISTING OF A COMMUNAL FACILITY BUILDING TO SERVE SIX SHEPHERDS HUTS HOLIDAY ACCOMMODATION, TEN CAR PARKING SPACES, ACCESS ROAD, SEPTIC TANK, TWO REED BEDS AND ASSOCIATED SITE WORKS
CONSTRUCTION OF AN ECO-TOURISM DEVELOPMENT CONSISTING OF A COMMUNAL FACILITY BUILDING TO SERVE SIX SHEPHERDS HUTS HOLIDAY ACCOMMODATION, TEN CAR PARKING SPACES, ACCESS ROAD, SEPTIC TANK, TWO REED BEDS AND ASSOCIATED SITE WORKS
CONSTRUCTION OF A DWELLING WITH CONNECTION TO EFFLUENT TREATMENT PLANT, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A REED BED AND WETLAND SECONDARY TREATMENT SYSTEM IN LIEU OF EFFLUENT TREATMENT PLANT GRANTED UNDER PLANNING APPLICATION REF 19/51832 AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 290 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561949The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief