Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 197 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF A DWELLING HOUSE WITH DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA
DEMOLITION OF EXISTING DWELLING HOUSE AND ERECTION OF NEW DWELLING HOUSE WITH USE OF EXISTING ANCILLARY SERVICES
(1) DEMOLITION OF EXISTING HABITABLE DWELLING HOUSE (2) ERECTION OF A NEW DWELLING HOUSE AND CONNECTION TO EXISTING ANCILLARY SERVICES
(1) A NEW 1,951.2M2 TWO STOREY SCHOOL BUILDING, CONTAINING 11 NO. GENERAL CLASSROOMS, SPECIAL TEACHING ROOMS FOR SCIENCE, ART AND BUSINESS STUDIES, OFFICES, TOILETS, STORES, PLANT ROOMS AND A FIRST FLOOR BRIDGE LINK TO THE EXISTING SCHOOL BUILDING, (2) A ROOF MOUNTED PHOTOVOLTAIC PANEL SYSTEM FOR COMPLIANCE WITH PART L OF THE BUILDING REGULATIONS AND (3) ALL ASSOCIATED SITE WORKS INCLUDING NEW LANDSCAPING, EXTERNAL STEPS TO EXISTING GRASS PLAY, AND ASSOCIATED SITE DEVELOPMENT AND SERVICE INFRASTRUCTURE WORKS
The brief summarizes the pattern across all 197 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561973The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief