Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 324 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
DWELLING HOUSE WITH ON-SITE SEWAGE SYSTEM AND ASSOCIATED WORKS AND PERMISSION FOR DEMOLITION OF EXISTING DWELLING HOUSE DUE TO DEFECTIVE CONCRETE BLOCKS AND CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE WITH CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS
CONSTRUCTION OF A NEW ELECTRICITY OVERHEAD POWER LINE WITH ASSOCIATED POLES, MASTS, UNDERGROUND CABLING, SITE WORKS AND ALL ANCILLARY DEVELOPMENT, FOR A 38KV GRID CONNECTION TO LINK THE CONSENTED LETTERGULL WIND FARM, MOMEEN AND LETTERGULL TOWNLANDS, RAPHOE WITH THE EXISTING LETTERKENNY 110KV SUBSTATION IN LISTILLION TOWNLAND, LETTERKENNY. THE POWER LINE WILL BE APPROXIMATELY 10.16 KILOMETRES LONG. ALL STRUCTURES RANGE IN HEIGHT FROM 12 METRES TO 19 METRES. THE MAJORITY OF THE OVERHEAD LINE STRUCTURES ARE WOODEN POLE SETS; INCLUDING 5 STEEL MAST STRUCTURES. THE ELECTRICITY POWER LINE WILL BE OVERHEAD EXCEPT FOR SHORT SECTIONS ALONG THE FOLLOWING ROAD SECTIONS; N13-8 LISTILLION TOWNLAND (TD.), L-5794-1 LISTILLION TD., L-5634-2 KINCRAIGY TD., L-5644-1 ROOSKEY TD. AND L-5664-1 ROOSKEY TD. WHERE IT IS TO BE LAID UNDERGROUND. THE PROPOSED POWER CABLE WILL TRAVERSE THE FOLLOWING TOWNLANDS (FROM SUBSTATION TO CONSENTED WIND FARM SITE); LISTILLION TD, LURGY TD, KNOCKBRACK TD, AGHLEHARD TD, TREANAVINNY TD, GLENMAQUIN LOWER TD (PART UNDERGROUND) KINCRAIGY TD (PART UNDERGROUND), ROOSKEY TD (PART UNDERGROUND), LISCLAMERTY TD, CARRICKNAMART TD, MONDOOEY UPPER TD, MONDOOEY MIDDLE TD, BALLYHOLEY FAR TD, DRUMATOLAND TD, SHESKINAPOLL TD, CARRICKADAWSON TD, WOODLAND TD AND MOMEEN TD (PART UNDERGROUND)
DEMOLITION OF EXISTING COTTAGE AND ATTACHED SHED, CONSTRUCTION OF A NEW SINGLE STOREY, PART STOREY AND A HALF DWELLING, CONSTRUCTION OF A DOMESTIC GARAGE/STORE & INSTALLATION OF A WASTEWATER TREATMENT SYSTEM AND SOIL POLISHING FILTER WITH ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A SINGLE STOREY OUTBUILDING FOR THE PURPOSES OF DOMESTIC USE, INDOOR SWIMMING POOL WITH CONNECTION TO APPROVED SEWAGE TREATMENT SYSTEM UNDER PLANNING REFERENCE NO. 19/50778, WITH ALL ASSOCIATED SITE WORKS
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE
CONSTRUCTION OF A DWELLING HOUSE WITH CONNECTION TO PROPOSED SEPTIC TANK AND PERCOLATION AREA
The brief summarizes the pattern across all 324 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2562066The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief