Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 81 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) ERECTION OF A TEMPORARY 100M HIGH LATTICE TYPE METEOROLOGICAL MAST INCLUDING ANCILLARY WORKS FOR A PERIOD OF 5 YEARS, TO BE FIXED TO GROUND ANCHORS BY GUY WIRES AND INCLUDING INSTRUMENTS FOR MEASURING LOCAL CLIMATE CONDITIONS, SERVICES AND ASSOCIATED EQUIPMENT, (2) INFRA-RED LED AVIATION LIGHT TO BE FITTED NEAR THE TOP OF THE LATTICE SECTION OF THE PROPOSED METEOROLOGICAL MAST AND (3) BIRD FLIGHT DETERRENT MARKERS TO BE FITTED TO EACH GUY WIRE AT APPROXIMATELY 10M INTERVALS. AN APPROPRIATE ASSESSMENT AND NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
CONSTRUCTION OF A DWELLING HOUSE, SEPTIC TANK / WASTEWATER TREATMENT SYSTEM AND ASSOCIATED SITE WORKS
STORAGE AREA EXTENSION TO SIDE OF EXISTING WORKSHOP PREVIOUSLY APPROVED UNDER PLANNING REF. NO. 05/9063 AND PERMISSION FOR ERECTION OF 3 NO. PORTACABINS FOR OFFICE USE AND ALL ASSOCIATED SITE WORKS
(1) RETENTION OF (A) MOBILE HOME STRUCTURE PLACED WITHIN THE SITE AND USED AS TEMPORARY ACCOMMODATION FOR THE DURATION OF CONSTRUCTION WORKS RELATING TO THE DEVELOPMENT SOUGHT HEREIN AND (B) DETACHED DOMESTIC STORAGE SHED AND (2) (A) ALTERATION AND RENOVATION WORKS TO EXISTING DERELICT COTTAGE, INCLUDING DEVELOPMENT OF AN EXTENSION TO THE SOUTH WESTERN SIDE WHICH INCORPORATES USEABLE FIRST FLOOR ACCOMMODATION, (B) DEMOLITION OF ATTACHED BYRE AND (C) INSTALLATION OF A NEW SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING HOUSE AND DOMESTIC GARAGE INCORPORATING A WASTEWATER SEWAGE TREATMENT SYSTEM AND ALL ANCILLARY SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 81 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2562291The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief