Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 1,799 decisions within 5 km, 2 exact-site or onsite candidate records, and 134 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
134 structured nearby appeal records.
134 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission will consist of: A) The conversion of part of the former PJ Carroll's factory, a protected structure ref. D182, and the associated former boiler house building into 3487 sqm of apprenticeship teaching facilities. The Works to the main factory building consist of modifying the interior, stripping out some internal walls and the construction of new motor vehicle workshops, electrical workshops, classrooms and other ancillary spaces, and a new mezzanine office space. To facilitate these new teaching spaces minor modifications are proposed to the elevations. On the Eastern elevation, existing roller shutters will be removed and replaced with brick panels, new roller shutters and escape doors will be provided. On the Southern Elevation, one set of solid access doors is to be provided and two brick faced bays are to be replaced with new glazed screen and fire escape doors to match existing. Two new rooflights are proposed, to match the existing. B) The demolition of a small service building behind the former boiler house. C)The former boiler house will be refurbished to provide additional carpentry and joinery apprentice teaching spaces, a new mezzanine office space, associated modifications to the façade, replacement of the roof with a new membrane system, new fall restraint and arrest systems, access ladders and services. D) The removal of three obsolete boiler flues from the south elevation of the former boiler house. E) The construction of a new timber store and preparation building to the south of the former boiler house with steel structure, brick detailing and clerestory glazing to match the existing buildings adjacent. F) Modifications to an existing small garage building and provision of new roller shutters (88.6 sqm). E) Provision for 10 additional bike parking spaces. F) All associated ancillary site and landscaping works.
Permission for development at the former Carroll's Factory Building, a protected structure, ref. no. D182. The development will consist of the conversion of part of the former Carroll's Factory Building and the associated former Energy Centre building into 1231sqm of Apprenticeship Teaching Facilities. The Carroll's building works consist of modifying the interior, stripping out of internal walls and the formation of plumbing and electrical apprenticeship areas and a new mezzanine office area. The removal of 2 no. brick faced bays on the south façade and insertion of new glazing, doors and ramps. Energy Centre building works consist of stripping off the existing roof covering and replacing with new membrane roofing system, new fall arrest system, access hatch and services, insertion of new entrance doors, exit doors, new ramps, stripping out of redundant services, modification to floor, and new roof access ladder. Brickwork walls to the refurbished area are to be cleared and a cill added below glazing. Works to the Research Lab include a 2.4m high partition. Works in the service compound area include installation of a 4.2m high tank. Permission also sough for 8 no. cycle parking spaces and all associated site development works
EXTENSION OF DURATION OF 15/285 - Permission for a development consisting of 4 no. blocks of student housing three storeys in height and comprising 21 units each, each containing 9 rooms (total 189 rooms), a 127 room nursing home two storeys in height with ancillary facilities, a research, development and training centre five storeys in height and with a gross floor area of 12,286 sq.m all with associated parking, roof - top plant including optional solar / photovoltaic panels and all associated site development works. ***Significant Further Information 21/07/2015***
Permission for extension & alterations to an existing dwelling house, relocation of existing vehicular entrance and associated site development works.
Permission for the change of use of existing single storey residential dwelling to student accommodation and permission for a single storey extension to front and side, demolish single storey extension to rear, elevational changes, alterations to internal layout, relocation of existing vehicular entrance and associated site development works
Retention permission for a newly constructed section of single storey dwelling (formally existing dwelling as granted under Planning Ref. No. 22/36). Newly constructed section to form part of dwelling to be used for student accommodation
The brief summarizes the pattern across all 1,799 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660299The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.