Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 506 decisions within 5 km, 1 exact-site or onsite candidate record, and 19 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
19 structured nearby appeal records.
19 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To demolish part of the existing dwelling house, construct extensions to the existing dwelling house, construct a domestic garage/fuel store, install a new wastewater treatment system and percolation area and all ancillary site works
For the construction of a dwelling house, domestic garage, proprietary treatment system and all ancillary site works. Gross floor space of proposed works: House: 222.6 sqm, Garage: 35.1 sqm.
1. three temporary (3 months approx.) emergency pre fab units (two classrooms and one portaloo ) 2. retention and completion of a play equipment storage shed.
To provide a new foulwater polishing filter on the grounds at Gardenfield National School.
To construct a first floor extension to the existing primary school building at Gardenfield, Tuam. The development will include the following accommodation; a classroom with toilets, a GP room and an office. Gross floor space of proposed works: 188.7 sqm
For the construction of a dwelling house, effluent treatment system, domestic garage and all associated site works. Gross floor space of proposed works: 260 sqm
The brief summarizes the pattern across all 506 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660555The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief