Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 112 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) CONSTRUCTION OF EXTENSION TO EXISTING DWELLING CONSISTING OF AN ACCESSIBLE BEDROOM AND EN-SUITE WITH CONNECTION TO EXISTING ON-SITE SERVICES AND ALL ASSOCIATED SITE WORKS, (2) DEMOLITION OF EXISTING STORAGE SHED TO SIDE ELEVATION OF HOUSE AND (3) PARTIAL DEMOLITION AND REBUILD OF ADDITIONAL SHED TO ACCOMMODATE NEW EXTENSION
ERECTION OF AN AGRICULTURAL MACHINERY STORAGE SHED AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF AN EXTENSION TO THE FRONT OF EXISTING HOUSE ATTIC DEVELOPMENT AND ALL ASSOCIATED SITE WORKS
ERECTION OF A DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONVERSION OF AN EXISTING DOMESTIC GARAGE INTO LIVING ACCOMMODATION
(1) DEMOLITION OF A MICA AFFECTED HABITABLE DWELLING (2) PROVISION OF FIRST FLOOR LIVING ACCOMMODATION AND STORAGE WITHIN AN EXISTING DETACHED SHED INCLUDING CONNECTION TO THE EXISTING WASTEWATER TREATMENT SYSTEM (3) RECONSTRUCTION OF THE ABOVE DWELLING WITH CONNECTION TO EXISTING WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 112 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660925The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.