Applications tied to the site
Partial coverage16 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
16 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 13,532 decisions within 5 km, 16 exact-site or onsite candidate records, and 3086 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
16 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
16 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3086 structured nearby appeal records.
3,086 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Planning permission for development at this site will consist of the erection of a fully serviced single storey extension the rear of existing dwelling, with roof lights and all associated ancillary site works required.
The development will consist of the erection of a fully serviced single storey extension to the rear of existing dwelling, with roof lights and all associated ancillary site works required.
The development will consist of the construction single storey bay window to the front elevation, with canopy extending to front door, and widening of existing driveway entrance and all ancillary site works.
I, Dearbhaile O’Brien, intend to apply for permission for development at No. 13 Larkfield Park, Harold’s Cross, Dublin 6W. The proposed development will consist of the construction of a new vehicular entrance with front boundary alterations and footpath dishing to the front of the existing property.
Permission sought for new vehicular entrance at front.
(i) demolition of existing single-storey rear garden shed, and demolition of existing single-storey garden shed to the side of the dwelling; (ii) construction of a part-single, part-two-storey flat roofed extension to the rear/side of the existing dwelling with 3 no. rooflights provided for kitchen/dining/utility room at ground floor level and new bathroom at first floor level. The works proposed result in a 2 storey, 3 bed residential dwelling.; (iii) internal reconfiguration (including removal of internal partition walls) at ground and first floor levels to accommodate the proposed extension; (iv) external revisions to front, side and rear elevations including amendments to windows at ground and first floor levels; and (v) all ancillary works, including internal layout revisions, as necessary to facilitate the development.
The brief summarizes the pattern across all 13,532 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2098/21The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief