Applications tied to the site
Partial coverage16 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
16 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 12,476 decisions within 5 km, 16 exact-site or onsite candidate records, and 1604 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
16 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
16 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1604 structured nearby appeal records.
1,604 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Planning permission for the development will consist of: (a) demolition of existing single storey structures to the rear, (b) construction of new part single storey part two storey flat roof extension to the rear, (c) construction of new dormer element to the rear roof slope, (d) all associated new openings, internal layout alterations, site landscaping, drainage and ancillary works.
The proposed development will consist of:- The existing rear two storey extension is being demolished and a new two storey flat roofed extension is to be constructed to the rear along with the internal refurbishment of the existing terrace house.
This development will consist of: (1) Construction of a single-storey flat-roofed structure at the rear, (2) Provision of new roof-light over stairs half-landing, (3) Provision of new rooflight in existing bathroom, and (4) All associated works and services necessary to facilitate the development.
The demolition of the existing rear extension and the construction of a new part-one and part-two storey rear extension, installation of new roof-light and skylight at rear, internal alterations to existing dwelling to accommodate proposed new internal layout and all ancillary site works.
RETENTION: The development consists of the retention of the conversion of existing 25sqm rear garage to a habitable room and associated private laneway and courtyard elevational changes including high-level window and door to lane.
Planning permission is sought by Roger English for the following works: (i) Widening of existing pedestrian entrance wall & railings (ii) Alterations to existing front elevation to include a new front façade (comprising of traditional timber style panelling & pilasters, new signage, and reformation & widening of existing window / door ope), and all associated site works necessary to facilitate the development.
The brief summarizes the pattern across all 12,476 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2137/21The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief