Applications tied to the site
Partial coverage20 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
20 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 12,466 decisions within 5 km, 20 exact-site or onsite candidate records, and 1794 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
20 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
20 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1794 structured nearby appeal records.
1,794 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Planning permission is sought at unit on Junction of Sheriff Street Upper and East Road, Dublin 1 for change of use from previously approved retail shop and ancillary uses (reg. ref. 0283/03 & 2633/08) to office use with ancillary staff facilities. new shopfront to Sheriff Street & East Road with associated signage and all associated site works to facilitate the development.
The proposed development consists of the construction of a commercial office with a total gross floor area of c. 10,141 sq.m ranging in height from 5 to 8 storeys (incl. screened plant floor at 7th floor) (maximum height of c 31.96m (33.95m OD)) with a proposed basement -1 level. The ground floor includes office entrance, coffee dock, co-working/meeting zone, reception, post room, office space, lifts and circulation areas and sub-station. A proposed basement -1 level contains office areas, plant, staff areas, and cycle parking. External accessible terraces will be provided at 4th floor (c.5 sq.m on southern elevation facing terrace along Sheriff Street Upper), at 5th floor (c.174 sq.m on north west elevation facing terrace to East Road) and at 6th floor (c. 48 sq.m on west elevation facing terrace to junction of Sheriff Street Upper and East Road). The proposed development is designed to integrate into the adjacent permitted residential scheme (ABP Ref: TA29N.308827). Cycle parking for the office is located at basement level (135 spaces with associated facilities) accessed via 2 no, lifts, and 20 visitor spaces and 4 no. cargo bike spaces are provided at street level in the associated public realm. The development also includes for enhanced landscaping and public realm along Sheriff Street Upper and East Road. The proposed development also includes for the provision of screened plant at roof level; PV panels; green roofs; new ESB substation; associated site servicing (foul and surface water drainage and water supply); and all other associated site development works above and below ground.
Permission for development on a site of c.0.22 ha which forms part of the Castleforbes Business Park, Sheriff Street Upper and East Road, Dublin 1. The site is bound by Sheriff Street Upper to the south, Castleforbes Business Park to the north and east, and East Road to the west. The proposed development consists of the demolition of all existing structures on the site and the construction of a 219 bedroom hotel ranging in height from 6 to 9 storeys (maximum height of c.33.95m) with total gross floor area of c.9,241sq.m (incl. basement). The ground floor includes hotel reception/lobby/check in area, a public bar with seating area, a public restaurant area with seating area, a cafe/work zone, kitchen, staff area, storage areas, lifts and circulation areas, plant, and ancillary office areas. Floors one to eight typically contain, bedrooms, linen and clearing stores, lifts and circulation areas with a gym and wellness centre located on floor one. A proposed basement -1 level contains plant, storage, staff areas, laundry store and staff cycle parking. A service access is provided from Sheriff Street Upper to the east of the site to a dedicated service area. The development also includes for enhanced landscaping and public realm along Sheriff Street Upper and East Road including for visitor cycle parking. The proposed development also includes for the provision of screened plant at roof level; PV panels; green roofs; new ESB substation; associated site servicing (foul and surface water drainage and water supply); and all other associated site development works above and below ground.
The development will consist of the construction of a storage room to the rear of the main building.
The proposed development consists of the demolition of an existing 2 storey industrial/office building (331 sq m) and the construction of a 4 and 5 story block of apartments totalling 772 sq m (including roof garden) on a site of 267 sq m consisting of 1 no. studio apartment; 5 no. 1 bedroom apartments; 3 no. 2 bedroom apartments; balconies on the rear elevation at 1st to 4th floor levels; 18 no bicycle spaces; all associated site works and utility connections.
Permission for the demolition of the two storey industrial/office building (331 sq.m.) at 17/21 Church Street East and the construction of 28 no. apartments (with balconies) in a part five part six storey building (gross floor area 2,123 sq. m.) comprising 3 no. studio apartments (39-40 sq.m.), 15 no. one bedroom apartments (48-59 sq.m.) and 10 no. two bedroom apartments (65-88 sq.m.), 52 no. secure bicycle spaces, bin store and plant room, a landscaped communal roof terrace at fifth floor level, building accesses at Church Street East and Abercorn Road and all ancillary site development works on a site at nos. 17-23 Church Street East (D03A296 & D03A3X2) with frontage to Abercorn Road, East Wall, Dublin 3.
The brief summarizes the pattern across all 12,466 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2152/19The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief