Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 8,960 decisions within 5 km, 4 exact-site or onsite candidate records, and 1161 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1161 structured nearby appeal records.
1,161 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
The development will consist of 1. Conversion of the attic space for the use as a study/playroom with roof extension to the side providing a new gable build up with half hipped roof, and a dormer window to the rear. 2. All drainage, structural and associated site works to be implemented.
The development will consist of (1) dormer window extension at the rear of the existing roof; (2) single storey ground floor extension to the rear and including all ancillary works.
PERMISSION:The development will consist of building a single-storey detached exercise and therapy room in the rear garden of the dwelling including all associated site and drainage works.
The development will consist of (i) the demolition of the garage at the side of the house, (ii) building a single-storey accessible extension at the rear comprising bedroom and kitchen, (iii) widening the existing vehicular entrance at the front to facilitate a disability access vehicle and (iv) all associated internal, site and drainage work.
Permission for 1. demolition of rear conservatory extension and rear garden shed building. 2. construction of a new home office in rear garden; 3. for a new two storey and single storey rear extension; 4. placement of 2 windows at first floor and 2 new windows in ground floor in side gable wall and 2 new velux windows in main roof to rear.
Planning permission for a one-storey pitch roof front porch/ living room extension and a new external window above the porch on the first floor, all at the front of the existing two-storey terrace type house. To the rear of the house, a proposed two-storey pitch roof extension with three skylights on the pitch roof, flat roof canopy above the patio area at ground floor. Finally on the existing house pitch roof one skylight to the front and one skylight to the rear and any other associated renovation work/external works.
The brief summarizes the pattern across all 8,960 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2178/19The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief