Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 12,555 decisions within 5 km, 5 exact-site or onsite candidate records, and 2140 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2140 structured nearby appeal records.
2,140 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
The development will consist of replacement/demolition of a temporary storage unit of 4.15m2 and the erection of a single storey building of 221m2, 41.15 metre high, to accommodate Clinical Supply Facilities, a patient reception area including linked access to the existing hospital corridors, plant equipment and all other site development works, above and below ground required to facilitate the development, all at podium level within Courtyard 12, Phase 1C of the Main Hospital Block. This proposed development is to facilitate the reconfiguration of the Cardiac Catheterisation Laboratory and associated departments.
The proposed development consists of the installation of rooftop telecommunications equipment including 6 no. Antennas, 1 no. dish, remote radio units (RRU’s), cable trays, GPS, site lamp, gantry poles, portable ladder, cabinets and all associated site development works in order to provide for high-speed wireless data and broadband services
RETENTION PERMISSION: the development consists of the retention of (1) a three storey Cardiology and Respiratory Unit (CRU) building with roof top boiler room and screened plant enclosure; (2) the enclosure of a courtyard area in the adjoining outpatient's department (phase 1C) and its conversion to office space for the breast check unit; (3) the reconfiguration of the adjoining waiting rooms and reception area in the outpatient's department; (4) the retention of a single storey central cycle hub building.
The Board of St. James's Hospital intends to apply for planning permission for development in the courtyard to the north of the Bone Marrow Treatment Unit, Phase 1F, St. James's Hospital, James's Street, Dublin 8, D08 A978. The development will consist of the construction of a single storey 4.9m high extension (212 sq. m.) to the Bone Marrow Treatment Unit to accommodate 4 no. acute leukaemia hospital ward treatment units; a link corridor to the existing Bone Marrow Treatment Unit (a further 18 sq. m.); roof top plant equipment with 1.4m high screen; and all other site development works above and below ground required to facilitate the development, all at podium level within the adjacent courtyard.
PERMISSION & RETENTION. The Board of St James’s Hospital intends to apply for planning permission and retention permission for development at this site, St James’s Healthcare Campus, St James’s Street, Dublin 8. The development for which planning permission is sought will consist of a 55 sq. m. single storey extension to the Burns Unit to accommodate a dayroom and staff office. The development for which retention permission is sought consists of an 81.8 sq. m. elevated plant room erected to the west of the Burns Unit and a service bridge extension to the Burns Unit.
The construction of a single storey rear extension and garage structure constructed in 2005 and associated works. The extension consists of a WC and Hallway. The area of the extension and garage is circa 14.5m2 leaving the remaining amenity rear space of 9m2.
The brief summarizes the pattern across all 12,555 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2281/20The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief