Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

35A, Spring Garden Street, Ballybough, Dublin 3

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

12% of nearby decided applications were refused. The preview found 12,074 nearby planning records within 5 km where a location match is available.

Matched source
2297/19
Project type
One-off house
Coverage
5 km radius
12,074Nearby applications
12%Refused
10,590Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

2297/19

Planning permission sought for the demolition of existing single storey egg storage unit. The construction of a new two storey, two bedroom end of terrace house with single storey projection to the rear at ground floor level. Plus all associated site works.

Granted0.0 km06 June 2019
3659/20

Permission for construction of part 2 storey part single storey extension to rear, and all associated landscape and drainage works.

Granted0.0 km17 December 2020
WEB1406/21

Flat roofed extension of roof to rear and 2 rooflights to front, for bedroom and bathroom.

Granted0.1 km10 June 2021
WEB1382/19

Proposed first floor extension to rere incorporating changes to existing roof profile to rere.

Granted0.1 km23 August 2019
3309/24

Planning permission for development that will comprise of 2 no. rooflights to the front part of the roof, with associated internal and external alterations to dwelling house.

Granted0.1 km24 April 2024
WEB1591/20

Retention Completion Permission & Planning Permission For development at this site No.8D Ballybough, Avenue, Ballybough, Dublin. D03 V6P9 The development will consist of retention completion permission for new rear single storey extension and new windows in existing gable at ground floor Level and also permission for internal modifications and attic conversion with rear dormer window and removal of chimney.

Granted0.1 km15 October 2020

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required