Planning permission for demolishing existing garage at side and construct new single storey extension to front, side and rear. Attic conversion with dormer window to rear, two new windows at side at first floor and attic levels.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
29 Brookville Park, Artane, Dublin 5, D05K8F2
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
9% of nearby decided applications were refused. The preview found 6,485 nearby planning records within 5 km where a location match is available.
- Matched source
- 2340/21
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Conversion of her attic to non-habitable accommodation and a bathroom, including 2 velux rooflights to the front at roof level
To construct an extension to rear of existing dwelling including internal alterations all associated works.
The development will comprise an extension of c 8.1 sqm to an existing ESB substation to provide a switchroom with selected facing brickwork to match the existing ESB substation and all associated site development and site layout works.
Attic Conversion with velux roof light on the front and dormer window to the rear, pitched roof extension at the front and side of the dwelling at first floor level, new porch to the main entrance, widening of vehicular entrance and a domestic shed with hipped roof within the rear garden.
Planning Permission sought for Off Licence subsidiary to main Retail Use.
The full report covers all 6,485 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 2340/21The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report