Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 4,308 decisions within 5 km, 3 exact-site or onsite candidate records, and 401 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
401 structured nearby appeal records.
401 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
The development will consist of: Construction of new two bed detached bungalow total 83sqm, with pitched roof and 4sqm solar panels. All to rear of existing bungalow (No.2), and to be known as 2A Poppintree Cottages with off street parking. Vehicle access is via existing side entrance. All of the above to include new water connection and landscaping with all other services connected to existing.
Planning Permission for the following: (i) Upgrade to existing Effluent Treatment system to include a new Balance Tank, Screen, DAF and Sludge Tank all located within a new detached Effluent and Control Building to the South of the existing Factory, (ii) Single storey extension to the northern elevation of the existing Factory consisting of a Refrigeration Plant Room and Electrical Room and (iii) all associated site works
Planning permission for the conversion of the existing attic storage t
The development will consist of i) the construction of a single storey
Build new attic conversion as home office and storage, together 2 No.
The development will consist of 3no. 3-storey 4-bedroom terraced dwelling houses and 3no. parking spaces that are located to the rear of the proposed development at Hampton Wood Crescent.
The brief summarizes the pattern across all 4,308 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2538/19The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief