Applications tied to the site
Partial coverage23 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
23 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 11,197 decisions within 5 km, 23 exact-site or onsite candidate records, and 1424 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
23 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
23 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1424 structured nearby appeal records.
1,424 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Planning Permission is sought for proposed first floor extension and relocation of window to bedroom 3 over exempted development to rear of property at 17 Newgrange Road, Phibsboro, Dublin 7.
Construction of two-storey extension to rear of existing house and enlargement of front porch to accommodate internal layout modifications and new ancillary accommodation. External works to comprise of associated site works including new front boundary treatment.
The development will consist of a ground floor porch addition of 2 squared meters to the front of the house, a 6 square meter extension at first floor level to the rear elevation and a dormer addition at attic level to the rear elevation, (overall 8 meters squared). Partial demolition of the existing entrance porch and existing rear extension roof at ground floor level. Adjustment to the internal layout at second floor level and a new stair between the first floor and attic levels, with an en-suite to the attic room.
Planning permission for: (a) widening of existing vehicular access gates; (b) dishing of footpath to accomodate same; (c) all associated site works.
The development consists of the demolition of existing front porch side garage and shed and construction of a new flat roof porch with front and side extension to provide an office, utility room and WC. Also included is the construction of new single-storey flat roof extension to the rear to include new kitchen and dining space. The application includes internal alterations and all associated site works, drainage, and landscaping as necessary.
Demolition of existing side and rear single storey extension and construction of new single-storey flat roof extension to front, rear and side, including new front porch and rooflight, alterations to existing Façade and partial demolition and reconstruction of existing side boundary wall.
The brief summarizes the pattern across all 11,197 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2552/20The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief