The development will consist of; (i) first- floor extension to side and rear of existing semi-detached dwelling; (ii) extension of ground floor canopy to side; (iii) development to include; amendments to all elevations, rooflights, and all works necessary to facilitate the development.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
50, Copeland Grove, Clontarf, Dublin 3
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 10,395 nearby planning records within 5 km where a location match is available.
- Matched source
- 2581/21
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
RETENTION: The development consists of; widening of the existing vehicular entrance off Copeland Grove to 3.6m in width.
RETENTION: The development consists of: (i) the 3.65m high roof structure, with pier, over ground floor terrace area to rear of the dwelling; (ii) widening of the existing vehicular entrance off Copeland Grove to 3.6m in width.
PERMISSION:For two storey eight bedroom 433 square metre extension together with shed and bicycle store to the side and rear.
Permission for a contemporary detached single storey house/bungalow with three bedrooms to side of 52 Copeland Grove with access from Copeland Grove and minor alterations to front and side elevation of existing house.
Permission sought for detached single storey house/bungalow with three bedrooms to side of 52 Copeland Grove with access from Copeland Grove and minor alterations to front and side elevation of existing house all at 52 Copeland Grove, Dublin 3.
Source match
Matched from public planning record 2581/21The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report