Applications tied to the site
Partial coverage33 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
33 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 13,206 decisions within 5 km, 33 exact-site or onsite candidate records, and 1959 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
33 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
33 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1959 structured nearby appeal records.
1,959 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
PROTECTED STRUCTURE: the development will consist of: a change to shop front arrangement of the previous granted of permission (ref:4140/18) and the erection new shop front signage to the upper section of the elevation fronting Westmoreland street.
PROTECTED STRUCTURE: The development will consist of: amendments to the internal layout of the ground floor of the previously granted application ref: 4140/18 to include the removal and filling in of the existing stairs from ground floor to the basement, the introduction of a toilet at ground floor level and all site development works to facilitate these amendments.
PROTECTED STRUCTURE:PERMISSION & RETENTION:Works at ground and basement level change of use at upper floor levels restaurant and from office to hotel use at No.7 Westmoreland Street, D02 XF76 and 39 Fleet street D02 EK07 and associated development works, protected structure, and alterations to Temple Bar Inn hotel at basement, ground and fourth floor levels at 40-47 Fleet St, Temple Bar, Dublin 2, D02 NX25 Retention Permission is for: 1. modification to mezzanine level at ground floor,2. retention of basement opening connection to Temple Bar Inn 3. retention of rear yard deck at ground floor level 4. retention of alteration of existing window at ground floor to form an opening to rear yard 5. retention of dumb waiter unit between basement (restaurant) and ground floor (restaurant) Planning Permission for development works to consist of: 1. Upgrade of the building to include passive fire upgrade works, alarm and detection system, electrical and mechanical services upgrade for adaptive reuse to hotel from office use. 2. Refurbishment of interior and reordering layout to provide 10-bedroom suites with ancillary facilities. 3. Alterations to, including extension of existing Lift shaft at rear to provide new lift serving all floors. 4. New Internal connection to the Temple Bar Inn Hotel, 40-47 Fleet Street at basement and ground level. 5.New secondary means of fire escape enclosed external link at the rear providing internal connection between third and fourth floor to the Temple Bar Inn Hotel, 40-47 Fleet Street with enabling works to rear façade and alteration to chimney stack base at the rear 6. Removal of external fire escape stairs at fourth floor level of Temple Bar Inn Hotel 7. New dormer windows to mansard roof onto Fleet Street 8. Alterations to ground floor shopfront. 9. Removal of modern secondary internal casement windows at first floor level 10. Provision of an aov rooflight above stair well at roof level.
The development will consist of: the change of use of the existing building from retail at ground floor and basement and offices overhead to a 38 bedroom hotel with the addition of a new extension floor at attic level, for hotel use. The development will include, Basement- kitchen, storage and other services, Ground floor level hotel reception / check-in area, bar/café, disabled WC, lifts, stairwells and circulation areas; First to Fifth storey - provision of general bedroom accommodation with en-suites, lifts, associated ancillary areas and circulation areas; a new extension at roof level to a smaller footprint than the lower building levels to provide storage, bedrooms with en-suites, and ancillary facilities. One of the two existing retail units at street level will remain unaltered. The ground floor elevation will be upgraded and there will be no changes to the elevations of the existing upper floors. The new attic level will be set back from the existing elevations.
The proposed development will include upgrade and refurbishment works to existing building at 1-3 Westmoreland Street (approximately 1080 sq.m) and its basement and provide a new extension at roof level to provide hotel accommodation and associated ancillary facilities. The development will consist of: Internal and external modifications, reconfiguration, refurbishment and change of use of no. 1-3 Westmoreland Street and its vacant floors (to be extended) from retail/office to provide hotel facilities including a reception area, kitchen, storage, bedrooms, ensuites, circulation space and ancillary facilities. External works include the upgrading of the facades addressing Westmoreland Street and College Green - provision of a new facade frontage, new window and doorway configurations at ground floor level of the eastern facade and provision of a new facade frontage to the southern facade facing College Green. An extension at roof level to the same footprint of the lower building levels to provide storage, bedrooms, en-suites, circulation space and ancillary facilities. All of the above, resulting in the provision of a 40 no. bedroomed hotel building and all associated ancillary facilities as follows: Ground floor level - hotel reception/lobby/check-in area, disabled WC, office areas, lifts, stairwells and circulation areas. First to Fifth storey - provision of general bedroom accommodation, ensuites, lifts, associated ancillary areas and circulation areas. Basement level - plant area, toilet facilities, kitchen, storage areas, ESB switchroom and comms room, lift and circulation areas (with an overall basement area of approximately 145sq.m) The development will also comprise 2 no. signage zones on Westmoreland Street approximately 0.25sq.m and approximately 0.24sq.m and 2 no. projecting signs off the ground floor facade approximately 0.3sq.m each. Drainage works and all associated site development and ancillary works.
The development will consist of (a) the removal of the existing stall risers and general modifications to the existing shopfront, (b) the removal of the existing fascia signage, (c) the installation of a new double glazed Crittall framed glazing and entrance door complete with repairs and modifications to the shopfront, (d) the installation of new internally illuminated fascia signage, and (e) all associated site works.
The brief summarizes the pattern across all 13,206 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2592/19The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief