Applications tied to the site
Partial coverage11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 8,146 decisions within 5 km, 11 exact-site or onsite candidate records, and 905 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
905 structured nearby appeal records.
905 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Retention permission of an existing 3 No. Antennas attached to the facade of the building and 1 No. dish at roof level together with associated equipment and cabinets as previously granted under local authority reference 2069/10. The development will continue to form part of Meteor Mobile Communications Ltd existing and future telecommunications and broadband network.
RETENTION development will consist of a 20 foot long by 8 foot wide steel container which serves hot food and drinks positioned on the tarmacadam surface in the car parking area. Operating hours are Monday to Sunday 8:00am to 3:30pm and all ancillary works.
The development consists of a take away pizza restaurant within a former shipping container (14.52 sqm) with associated signage 4.5 sqm positioned on the tarmacadam surface in the car parking area operating Sunday to Thursday between the hours of 1pm and 12 midnight and Friday to Saturday between the hours of 1pm and 1am.
RETENTION and PLANNING PERMISSION for continuance of use for take away Pizza Restaurant and all associated site works.
Permission to construct a single storey rear extension to complement existing financial operations at the premises. Works will comprise of the construction of a single storey extension for office and administration purposes together with associated welfare facilities. There will be limited structural alteration to the rear elevation only of the existing building. New welfare facilities will be serviced by connection to existing establishment services.
The development will consist of the removal of the existing porch and single storey garage and the construction of a pitched roof single storey extension to the front and a pitched roof two storey extension to the side of the dwelling to comprise ancillary family accommodation, hard and soft landscaping and for all associated works above and below ground.
The brief summarizes the pattern across all 8,146 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2661/20The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief