PERMISSION & RETENTION: For widening and repositioning of the vehicular entrance with new piers, boundary wall & sliding gate and new porch and amendment to fenestration to front of the existing dwelling house.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
5, Bellvue Cottages, Glasnevin, Dublin 11, D11 Y8XY
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 8,206 nearby planning records within 5 km where a location match is available.
- Matched source
- 2835/20
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
RETENTION:Retention permission sought for single storey extension to rear and single storey extension to side, consisting of bedroom to rear and store/boiler to side together with relocated vehicular access all.
Planning Permission for the following works: - Removal of the existing front hipped roof. - Construction of a new single ridge roof to form gables at either end, to be sufficiently high to accommodate two number bedrooms and a bathroom at attic level and to join to the rear roof. - Construction of two number dormer windows for the bedrooms in the front roof. - Insertion of six number rooflights to the front and rear faces of the new roof. - Installation of new external insulation around the entire building. - Related internal and external alterations. At 20A Tolka Cottages, Old Finglas Road, Dublin 11, D11 CP5H.
The development will consist of: Construction of new three bed detached dormer bungalow (dormer in west elevation) with mansard roof (upper floor in roof) and 6sqm solar panels, all to the side of existing bungalow (No. 10). Existing vehicle access onto Glasnevin Downs widened to 3.2m for off street parking. All to include new water connection and boundaries untouched with all other services connected to existing.
The development will consist of construction of new three bed detached dormer bungalow with pitched roof and 6sqm solar panels. Three dormers total, all located to side, two to northern elevation (clear glazing) and one to southern elevation (opaque glazing). All to the rear of existing bungalow (No. 10). New vehicle access onto Glasnevin Downs with off street parking. All of the above to include new water connection and landscaping with all other services connected to existing.
The development will consist of: construction of new three bed detached dormer bungalow with pitched roof and 6sqm solar panels. All to the rear of existing bungalow (No.10), and to be known as 10A Bellvue Cottages). New vehicle access onto Glasnevin Downs with off street parking. All of the above to include new water connection and landscaping with all other services connected to existing.
The full report covers all 8,206 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 2835/20The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report