Permission for an outdoor seating area with timber, steel and glass dividing panels over sailing the Camac river to the east elevation.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Murray's Public House, 1, Bow Bridge, Kilmainham Lane, Dublin 8, D08 H1W6
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 11,981 nearby planning records within 5 km where a location match is available.
- Matched source
- 2937/21
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
PERMISSION & RETENTION: The proposed development will consist of the following: 1. Change of use of the formerly intended basement car park to bicycle and bin storage area, providing basement level lobbies with retention of removal of car lift and replacement with goods/ service lift. 2. Internal alterations, increasing the size of kitchen area, relocation of accessible W.C., and provision of G.F.L store area and internal lobbies to the existing public house. 3. Retention of alteration of entrance doors on the Bow Bridge elevation, from vehicle access doors to 1No. double doors and 1No. single door, internal alterations including all associated site and ancillary works.
CHANGE OF USE: Maroon Properties Limited intend to apply for planning permission for a development at Bow Bridge Business Centre, Bow Bridge, Kilmainham, Dublin 8, D08 K2NP. The development will include the change of use of an existing 4 storey office block to sheltered accommodation for homeless persons, inclusive of all ancillary site services and minor changes to existing elevations.
The development will include the change of use of an existing 4 storey office block to an early intervention centre/pre-school for children with autism spectrum disorder (ASD). The development will include the following: (i) raising the wall plate level and the ridge height to facilitate raising floors to bring the floor to ceiling heights in line with current building regulations, (ii) altering the window cill and head levels to suit the new floor levels, (iii) internal renovations throughout the building, (iv) all associated site works.
The development will consist of: (i) Removal of existing chimney stack, (ii) Roof extension at first floor level to provide a 3-storey, pitched roof dwelling, (iii) The provision of a new dormer window to the front, and (iv) All ancillary works necessary to facilitate the development.
The proposed development will consist of the insertion of 1 no. new car parking space into the existing semi-basement car park. This will result in a total of 43 no. car parking spaces being provided without affecting existing provision for bicycle parking or waste management / bin storage at semi-basement level. No other changes are proposed to the existing building.
Source match
Matched from public planning record 2937/21The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report