The development will consist of an attic conversion to include storage and wc with a dormer roof construction to the rear and velux roof light to the front, removal of existing chimney, internal refurbishment to existing dwelling and all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
22, Oriel Street Lower, North Dock, Dublin 1
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 12,408 nearby planning records within 5 km where a location match is available.
- Matched source
- 2965/20
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
The development will consist of the construction of a first floor extension over the existing single storey extension to the rear. Reconfiguration of the first floor with a new first floor window to the side. New velux roof lights to the rear to the attic storage space, velux roof light to the front, removal of existing chimney, internal refurbishment to existing dwelling and all associated site works.
The development consists of: i) The demolition of existing single storey commercial structure at corner of no. 78 Seville Place & Lower Oriel Street, the demolition of the internal structure to no. 77 Seville Place with the retention of the original facade & roof facing onto Seville Place and gable wall facing onto Fourth Avenue, the demolition of the internal structure & roof of the two storey terrace dwelling at 38 Lower Oriel Street with the retention of the original facade and the demolition of the internal structure of the single storey terrace dwelling at 60 Fourth Avenue with the retention of the original facade & roof; ii) The construction of a part 3 / part 4 storey mixed use development comprising 1 no. commercial unit (87 sq.m) at ground floor, 1 no. 3-bed residential unit (112 sq.m), 1 no. 2-bed residential unit (91 sq.m), 5 no. 1-bed residential units (52 sq.m-58 sq.m each), 2 no. studio residential units (38 sq.m each), and 1 no. penthouse residential unit (60 sq.m) giving a total of 10 residential units; iii) Bicycle & bin storage to ground floor; iv) Balconies fronting onto Seville Place, Fourth Avenue and Lower Oriel Street; v) Communal roof terrace at 3rd floor to serve all residential units; vi) Addition of new windows to existing gable wall of 77 Seville Place facing onto Fourth Avenue; vii) Minor amendments to existing facade of 77 Seville Place at ground floor level; viii) Dormer style windows facing onto Lower Oriel Street and Fourth Avenue; and all ancillary works necessary to facilitate the development.
Conversion of a previously combined property into its original two dwellings, to create two separate dwellings No 49 Third Avenue, Seville Place, and No 51 Third Avenue, Seville Place, internal alteration to close openings in the party wall and associated site works at 49 & 51 Third Avenue Seville Place Dublin 1.
RETENTION & PERMISSION: Retention permission is sought for the retention of the dormer roof to the rear of the existing cottage. The retention of the two roof lights to the front plane of the original cottage roof. Planning permission is sought for the replacement of the existing door from the dormer roof onto the flat roof extension with a new window. The removal of the guard/screen from the flat roof extension to the rear of the cottage.
Temporary change of use, for a period of 5 years, of existing industrial warehouse unit use to gymnasium / training facility use, internal fit-out only.
The full report covers all 12,408 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 2965/20The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report