The development will consist of the construction of a single storey extension to the rear, and a new porch, canopy and bay window with doors to front with associated works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
34, Crestfield Avenue, Whitehall, Dublin 9
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 8,263 nearby planning records within 5 km where a location match is available.
- Matched source
- 3143/21
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Planning Permission is sought for: 1/ Removal of existing chimney. 2 Conversion of existing attic to storage area, with 2no. new velux rooflights to front, new dormer window, and new Velux rooflight to rear, and all associates site works.
The development will consist of: The demolition of an existing single storey garage attached to existing semi-detached two storey house, sub-division of existing site for the construction of a 3 bedroom detached two storey house, utilisation of existing vehicular entrance, shared common and parking area to the front of existing and proposed house and all associated site works.
RETENTION: Planning permission is sought for retention of a two storey extension to rear, a porch extension to the fore, the conversion of attic to a storage room, with 2 no. rooflights to the fore of the existing semi-detached dwelling house with associated site works.
Planning permission to widen existing pedestrian entrance to create a new vehicular entrance to facilitate off street parking and EV charging with associated kerb dishing.
RETENTION The development will consist of the retention on a temporary basis of the previously permitted temporary site entrance (DCC Reg. ref 4179/16) on the Collins Avenue frontage at Dublin City University to facilitate access/egress of construction traffic on a limited and managed basis for the duration of the upcoming construction of the permitted Student Accommodation (ABP Reg. Ref. 305405-19) on DCU Glasnevin Campus which runs until 2028 and other planned developments on the campus subject to planning approval during this time.
The full report covers all 8,263 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 3143/21The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report