RETENTION: Retention Permission for development at a site located at Units 15/16 Business & Technology Park, Clonshaugh, Dublin 17. The development comprises a modification to Permission DCC Ref. 2229/19 (currently under construction) granted for a 2 storey data centre, (with generator yard and all associated works). The development now provides a larger, single storey substation (increased in size from c.34.5 sq.m (as permitted) to c.68.4 sq.m) and located to the south-west of the data centre building as per the parent permission DCC Ref. 2229/19.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Units 15/16 Clonshaugh Business & Technology Park, Clonshaugh, Dublin 17
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
8% of nearby decided applications were refused. The preview found 6,310 nearby planning records within 5 km where a location match is available.
- Matched source
- 3200/20
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Planning permission for development at a site of c.3.1ha comprising Units 15/16, Clonshaugh Business & Technology Park, Clonshaugh, Dublin 17. The development will comprise the following: Demolition of existing former industrial buildings (c.7,400 sq.m total GFA), associated plant and hard-standing. Construction of a 2 storey data centre including data halls, offices/admin, staff areas, storage/loading areas, circulation, UPS rooms, and roof plant (total floor area c.9,250 sq.m). Provision of a generator yard with 3 no. buildings (total floor area c.275 sq.m) housing 5 no. back-up generators. Provision of a substation building (floor area c.34.5sq.m), waste compound building (floor area c.16sq.m), 14 no. car parking spaces, 10 no. bicycle parking spaces, internal roads, docking/service yard, site lighting, new entrance gate, new security fencing to replace existing fencing. All associated site development works, landscape works and services provision. Total floor area of the proposed development is c.9,520.5m.
Permission for development on a site at Clonshaugh Business and Technology Park, Dublin 17. The subject site (with an area of c. 3.75 ha) comprises the site of former Units 15 and 16 (previously demolished) and the former Ricoh Building. The site is located to the north of the Santry River and the R104 Oscar Traynor Road, to the west of Clonshaugh Road, and to the south and east of existing estate roads. The proposed development, for which a seven-year permission is sought, comprises the following: -Demolition of the existing former Ricoh building, and all other associated site clearance works including removal of existing site services and ESB pillar boxes (other buildings previously occupying the site were demolished under Reg. Ref: 2229/19, a previously permitted data centre development, as amended by Reg.Ref:3200/20); -Construction of two data centre buildings (Data Centre A and Data Centre B), with a gross floor area (GFA) of c. 12,875 sq.m and c. 1,455 sq.m respectively, each over two storeys (with Data Centre A also including two mezzanine levels), with plant at roof level; -Data Centre A will be located in the northern portion of the site, with a parapet height of c.19.8 metres and will accommodate data halls, associated electrical and mechanical plant rooms, a loading bay, maintenance and storage space, office administration areas, with plant and solar panels at roof level; -Data Centre B (which will be ancillary to Data Centre A) will be located to the south of Data Centre A, with a parapet height of c.12.8 metres and will accommodate data halls, associated electrical and mechanical plant rooms, a loading bay, maintenance and storage space, office administration areas, with plant at roof level; -Emergency generators and associated flues will be provided within compounds adjoining each of the two data centre buildings (11 no. for Data Centre A and 1 no. for Data Centre B). -The development includes a diesel tank and a filling area to serve the proposed emergency generators; -Ancillary structures including a sprinkler tank and pumphouse, security building, MV building, and provision of two additional MV substation rooms to the existing substation on site (c. 115 sq.m additional GFA), which was previously constructed under Reg. Ref.: 2229/19 as amended by Reg. Ref.:3200/20. -Construction of access arrangements and internal road network and circulation areas, footpaths, provision of car parking (58 no. spaces) and bicycle parking (24 no. spaces); and -Hard and soft landscaping and planting, lighting, boundary treatments, and all associated and ancillary works including underground foul and storm water drainage network, and utility cables.
Planning application for the construction of a Security Hut at the IDA site in Clonshaugh. The proposed single-storey security hut at the IDA Site located at the junction of Oscar Traynor Road and Clonshaugh Road, within Clonshaugh Business and Technology Park, Dublin 17. The development will consist of a proposed structure approximately 3.3 meters in height, featuring zinc cladding and high-security finishes. There are no protected structures on the site.
Planning permission for: the construction of (a) an extension of the existing retail unit to create a dedicated modern, ancillary, warehouse area for storage of goods associated with the retail business including a delivery area canopy (b) an internal mezzanine for ancillary offices which would be ancillary to the retail use and all other ancillary works to facilitate the development.
Planning permission at: property adjacent and generally south of "The Range" store, Clonshaugh Road, Coolock, Dublin 17, for amendments to the permitted, licensed, foodstore as granted under ABP reference ABP-310695-21 (Dublin City Council Reference 3865/20). The amendments include: a revised car parking layout with spaces reduced from 78 to 70 spaces to accommodate a relocated trolley bay and one of the cycle parking areas to positions within the car park area. The movement of the bin storage cage to the northern side of the HGV service ramp and ESB substation building is relocated to a point at the south of the store. The overall gross floor area of the store increases from 2.349sqm to 2,377sqms. The net sales area increases from 1643sqms to 1655sqms. There is a small increase in the ridge height of the building by circa. 330mm. The amendments to the foodstore include revised layouts for the welfare/customer toilets/operation office; revised freezer/bakery preparation area; a proposed "Deposit Return Scheme" (DRS) room; IT and plant rooms relocated; revised entrance "pod" and the relocation the external poster display board. There are also some minor changes to the water supply, foul and surface water drainage network within the site and an increased attenuation area. The proposal includes all works to facilitate the completion of the development subject to the above amendments.
The full report covers all 6,310 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 3200/20The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report