Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 4,764 decisions within 5 km, 2 exact-site or onsite candidate records, and 627 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
627 structured nearby appeal records.
627 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Planning permission is sought for the construction of a 210sqm single storey ground floor extension to the west of the existing school to accommodate 2no. classrooms and 2no. resource rooms, along with internal alterations and associated site works.
The development will consist of a change of use from permitted retail use to retail use including the sale of alcohol for consumption off the premises (i.e. off licence use) within the overall permitted retail unit where the floor area for the off licence use is 6sqm and is ancillary to the primary retail use.
The development will consist of the construction of a new blockwork shed with flat roof situated at the eastern boundary of the rear garden. The shed is to include WC. Also included is new 30sqm flat roofed rear extension to the main dwelling. The application is to include all ancillary site works, drainage & landscaping as required.
The development will principally consist of: a lateral extension to the restaurant floor area by 67.6 sq m (from 328.2 sq m to 395.8 sq m) along the southern, western and eastern elevations of the building; a new fire door on the western elevation; the provision of a second entrance door on the southern elevation; amendments to the drive-thru booths on the eastern elevation; general elevation amendments; PV panels at roof level; minor revisions to the car parking layout including a new accessible parking bay resulting in a reduction of 1 No. car-parking space; and all associated site works.
Construction of a New dormer attic conversion to the rear roof of No 20 Newbrook Road, Donaghmede, Dublin 13 consisting of a new Bedroom.
Development will consist of a new ground floor only extension to the front, side & rear of the existing house and then changing use of ground & first floor of house to be used as pre/after school & crèche and all ancillary works.
The brief summarizes the pattern across all 4,764 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 3237/20The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief