Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

at Chapelizod Road (R109), Chapelizod, Dublin 8, and Irish National War Memorial Gardens (INWMG)

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The preview found 9,878 nearby planning records within 5 km where a location match is available.

Matched source
3275/24
Project type
One-off house
Coverage
5 km radius
9,878Nearby applications
13%Refused
8,562Conditional grants
4Refusal reasons

Top refusal reasons nearby

Visual Amenity2
Design1
Residential Amenity1

Nearest similar decisions

3275/24

PROTECTED STRUCTURE We, the Commissioners of Public Works, are applying for Planning Permission to the above named authority to construct a new accessible commemorative pedestrian and cycle bridge across the River Liffey which will also provide a new ceremonial entrance to the Irish National War Memorial Gardens (INWMG) at Chapelizod Road (R 109), Chapelizod, Dublin 8, Dublin. Under the Dublin City Development Plan 2022 - 2028, this site is included on the Record of Protected Structures, Ref. No. 2028 (Con Colbert Road, Dublin 8. Memorial Park, Islandbridge). The works will comprise of a lightweight arched stainless steel bridge to cross over the River Liffey with an uninterrupted span of 58 metres and a structural depth of approximately 0.35 metres. Works on both sides of the proposed stainless steel bridge to include: - a new ceremonial entrance plaza with stainless steel gates, granite wall and granite paved set-down area, with - a new permeable asphalt path connected to the bridge (northern end) and also running from the bridge (southern end) land on axis with the Temple (built 1993) in the INWMG. Areas of granite paving will drain to open jointed soak-away channels. The permeable asphalt paths do not require any additional drainage. All rainwater run-off will be retained on site to percolate into the ground. Enabling works and all ancillary site services be carried out as part of this proposed development. Removal of 7 trees on the north side of the river to allow for a safe wayfinding to the bridge. Proposed wildflowers planting to the northern side and mown grass to the southern side to match the rest of the INWMG. A Natura Impact Statement has been prepared in respect of this planning application. This application relates to Objective SMTO27 on the land Development Plan 2022 - 2028 Sustainable Movement and Transport.

Granted0.0 km10 October 2024
3808/21

PROTECTED STRUCTURE The development will consist of repair, conservation, change of use, and minor additions and alterations to, and ancillary works to a number of buildings in the Magazine Fort (a Protected Structure, RPS 6760, and on the Record of Monuments and Places RMP nos. DU018-007019) to facilitate access and use by the public, and will include: 1. The repair, conservation, change of use and minor alterations of the existing Johnston Ravelin Buildings which consist of Officers Quarters (a 1 storey building with an existing half basement, and total GFA of 329 m2, referred to as Building K in the Planning Application documents and drawings), Sergeants Quarters (a 1 storey with existing basement and total GFA of 213 m2, Building L), Men's Hut (a 1 storey building with a total GFA of 40 m2, Building O) Ablution Room (a 1 storey building with a total GFA of 21m2, Building H), Sentry Box (a 1 storey building with a total GFA of 25 m2, Building J), Men's WCs (Building M, a 1 storey building with a total GFA of 22 m2), Women's Washhouse (Building N, a 1 storey building with a total GFA of 9 m2), and Women's WCs (Building W, a 1 storey building with a total GFA of 1 m2); The repair and conservation work of the Fort's Johnston Ravelin Buildings (Buildings H,K, L, N and W listed above) includes re-roofing with slate and lead flashings, new cast-iron rainwater goods, and general repairs to brickwork, windows, doors, timber flooring, ceiling, chimneys, plasterwork and joinery. The repair and conservation works at the Johnston Ravelin courtyard and moat areas will consist of the refurbishment and augmentation of the existing cobbles and stone paving and the reinstatement of salvaged metalwork (gates and railings) to the courtyard; A change of use of the former Officers' Quarters and Sergeants Quarters (Buildings K and L) for use as Visitor and Staff Facilities to include, at ground floor level, Visitor Reception, Locker Room, Tea Room, Accessible Toilets and Staff Offices; and, at basement level, Kitchen, Staff Facilities (toilets,changing rooms, lockers) additional Visitor Toilets, Plant Rooms and general storage areas totalling GFA of 534 m2. Alterations to the internal existing fabric will consist of 2 nos. openings in 2 nos. walls in the Officers' Quarters and Sergeants Quarters (Buildings K and L), and the partial removal of timber flooring at ground floor level to provide for new staff stairs, the removal of damaged timber flooring at the basement and replacing with concrete; Alterations to the external fabric will include the removal of derelict subsidiary stair, wall and toilets, the removal of damaged external concrete ground surfaces, the removal of modern external gate, the removal of the Men's Hut, the removal of the metal shed to Ablution Room. New internal built works include the provision of new staff stairs and new partitioning for the new toilets; New external built works include the replacing of existing external concrete surface and limited cobbled areas with new textured concrete with integrated wayfinding recessed elements; the provision of new guardrails and addition of new external stairs to moat area, a new postern gate at the south moat wall, and a new metal external entrance gate and bridge with signage; 2. The restoration of the Duke of Dorset Archway, using original stonework which is currently stored on site. Interventions to the inner entrance bridge to consist of the removal of the existing metal grating and the provision of proposed new metal walkway and guardrails onto existing steel l-beams; 3. The insertion of a new metal walkway (809 m2) at the inner Fort ground level and at the Rampart Walls bank level to facilitate a universally accessible circumnavigational public access of the Fort and Ramparts (Building Z) to consist of: At ground level, the removal of damaged concrete paths and repair of surrounding cobble surfaces and the insertion of the proposed 1.8m wide perforated metal walkways supported on sleepers following the existing layout of concrete paths and concealing electrical services distribution; Alterations to the existing fabric of the Rampart Walls consisting of the opening up of gun embrasures located along the West, South and East elevations by the removal of later additions of concrete blockwork. At rampart level, the provision of an assembly of sleepers set into the grounds bearing the new perforated metal walkways & guarding aligned with the lower stone step level (at c. 250mm above the Rampart Walls bank level) at the Northwest bastion and along the West portion of the existing Rampart Walls and aligned with the top stone step level (at c. 750mm above the Rampart Walls bank level) at the Southwest bastion and along the South portion of the Rampart Walls, the provision of guarding at the Southeast bastion, the provision of steel safety guarding at the newly opened existing gun embrasures, and a new flagpole at the existing flagpole platform at the Southeast bastion. No element of the proposed walkway is above the existing height of the Rampart Walls' parapets; The provision of access at change of levels between ground and rampart walkways involving the erection of 2 no. steel truss ramps at the Northwest and Southeast bastions; and a Part M accessible lift and access lobbies (2 storeys and c.7.2m in height) at the Northwest bastion. The lift structure will consist of a weathered blockwork shaft on concrete pit foundation with adjoining protected access lobbies, all clad in metal cladding; 4. The repair, conservation, change of use and minor alteration of the existing corrugated iron Bakery Building (a 1 storey building with a total GFA of 296 m2, Building B) consisting of local repairs where necessary for Health & Safety, to the wall sheeting and the replacement of roof coverings, cleaning of the steel frame and stanchion structural remedial works, the provision of new metal rainwater goods, and the restoration and weatherproofing of windows and doors. The change of use consists of the use of the Bakery Building as a new unheated exhibition and visitor orientation/gathering spaces (total GFA of 296 m2). Alterations to the existing fabric include the removal of 1 no. corrugated sheeting wall; 5. The repair, conservation, change of use and minor alteration of the existing Magazine Gunpowder Store Buildings (a 1 storey building containing 3 no. Vaults with a total GFA 704 m2, Building A) to consist of: Repair and conservation works including the recovering of slate roofing with new felt and timber battens and re-use of existing slate, with new slate as required to match existing, the restoration of stone capping, the repair of external wall harling and stonework, the restoration of rainwater goods and new to match existing where required, the repair of existing timber flooring, and the repair of the brick vaulted structure, including structural stitching to corners; The change of use of the Magazine vaults consists of the use of the former Vaults as new unheated exhibition spaces, including exhibition space (296 m2) in Vault A, and immersive audio-visual installations in Vaults B & C (total of 408 m2); Alterations to the existing fabric to consist of the provision of a connection between Vaults B and C and the demolition of relevant wall section, the removal of later added concrete flooring in Vault C and the removal of later added brickwork to the front of Vault C. New build consists of the insertion of a new metal walkway, seating and railings supported on steel frame and timber sleepers, in Vaults B & C and the porch of Vault A; and the provision of a new dark room door at the front of Vault C., and lining to the proposed connection; 6. The repair, conservation and change of use of the Shifting Room (a 1 storey building with a total GF of 25 m2, Building G) to provide a new switchroom and an AV room; 7. The provision of electrical services along the new walkways; which consists of the removal of existing switchboards in the Sentry Box (a 2 storey building with a total GFA of, 22 m2, Building J) and provision of a switchroom in the Officers' Quarters the provision of surface ducting (below proposed metal walkway-see 3.);8. The repair of existing drainage networks as necessary and provision of new connections from the Johnston Ravelin visitor facilities (see 1.) to the existing network.

Granted0.3 km23 June 2022
3899/19

Planning permission for (a) demolition of existing single storey garage in ruin and (b) construction of a new 2 storey 3 bed dwelling house with connection to existing foul sewer line and existing surface water drains.

Refused0.3 km22 October 2019
2729/19

Planning permission is sought for the following development: (i) Demolition of 2 no. existing dwellings, 'Park Cottage' two storey, 'Fatima' single storey and outbuildings; (ii) Construction of a four-storey over basement apartment development consisting of 7 no. two bedroom and 2 no. one bedroom apartments each with an associated balcony / terrace areas and a setback at third floor level; (iii) 2 no. car parking spaces, a bin store and bicycle parking will be provided at ground-floor level along with a car lift to serve basement; (iv) 8 no. car parking spaces and plant will be provided at basement level and, (v) new pedestrian and vehicular access onto Chapelizod Road, landscaping, boundary treatments, SuDS drainage and all ancillary works necessary to facilitate the development.

Refused0.4 km04 June 2019
WEB5421/25

(i) change of use of vacant unit at Museum Unit, Block C, Bellevue, Islandbridge, Kilmainham, Dublin 8, to 2 no. studio apartments and 24.6sq.m museum/community room at ground floor level and 2 no. one-bedroom apartments at first floor level; (ii) internal alterations to facilitate the change of use. Apartment 2 (studio) at ground floor level will be served by private amenity space in the form of an existing terrace to the south of the building; (iii) minor external alterations include the provision of a new entrance for the ground floor apartment; and (iv) all ancillary works necessary to facilitate the development.

Refused0.4 km09 December 2025
3843/21

Permission for development at this site of c. 0.1276 ha, which comprises part of the garden of 110 Inchicore Road, Kilmainham, Dublin 8, DO8X5R9, located to the rear of 102, 104, 106 and 108 Inchicore Road, Kilmainham, Dublin 8 (Eircodes D08Y57C, DO8K6F9, D08E7P3 and DO8Y9K2, respectively), and the associated laneway between 108 and 110 Inchicore Road, Kilmainham, Dublin 8 (Eircodes DO8Y9K2 and D08X5R9, respectively). The development will consist of the demolition of an existing shed (c. 42 sq m) and the construction of a detached two storey six bedroom dwelling (c. 239 sq m) and associated detached garage (c. 32 sq m). The development will also comprise: hard and soft landscaping including the provision of boundary treatments, gates and fencing where required; associated site servicing (foul and surface water drainage and water supply); and all other site excavation and development works above and below ground.

Granted0.4 km20 April 2022

The full report covers all 9,878 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required