Applications tied to the site
Partial coverage15 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
15 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 12,913 decisions within 5 km, 15 exact-site or onsite candidate records, and 1748 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
15 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
15 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1748 structured nearby appeal records.
1,748 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
RETENTION. PROTECTED STRUCTURE. The development consists of the retention of the works carried out to date to 7 No. existing apartments, namely (a) external works including wig repointing of entire front elevation, cleaning of cills, plinths, parapets and stone surround to front door, replacement of previously replaced roof timbers, replacement of synthetic slates with natural roof slates, repointing of chimney stack and coping stones to parapet, replacement of 10 no uPVC windows with timber sliding sash windows, replacement of concrete steps with granite steps and repointing of granite cappings below the new front railing, refurbishment of the fanlight over the front door, installation of new cast iron rainwater downpipe, removal of “thrust out” structure to rear and (b) internal works including removal of all electrical, plumbing and drainage services, removal of the following non original items to all storeys; ceilings and covings, partition walls, decayed floor joists, floor coverings, doors, plasterboard linings to external walls and underside of stairs. (c) All associated site works.
PROTECTED STRUCTURE: RPS no. 6849. The development consists of: (i) three storey over lower ground floor extension to the rear, (ii) relocation of stairwell to the new extension. (iii) change of use of the completed building from residential to hostel type use. (iv) internal layout revisions to accommodate same, (v) removal of later addition overhanging W.C. to the rear elevation (vi) repairs to the existing roof and chimney (vii) re-point existing external brick walls (viii) replacement of existing aluminium windows with heritage style timber sash windows, (ix) all associated site works.
PROTETED STRUCTURE: Planning permission consists of: (i) the renovation of the existing dilapidated dwelling house, (ii) Internal repairs and refurbishment works to the existing building, (iii) reinstatement of main roof, timber sash windows, front entrance door, front railings and repair of all external elevations to the existing building, (iv) the construction of a new 3 storey over basement extension to the rear, (v) all associated site works.
PROTECTED STRUCTURE: The development consists of: (i) The addition of a second floor to the extension granted under PL 3241/20 and modified with condition No. 3 and changes to fenestration to accommodate same, (ii) The change of use of the completed building from residential to a 10 bedroom Bed and Breakfast and internal layout revisions to accommodate same. (iii) Change of basement level elevation from brick to plaster. (iv) New side entrance door and external stairs. (v) All associated site works.
Change of use of office/retail development on 5 floors over basement car park to Health Clinic and medical consultants' suites to be comprised of 3 no. Clinic Areas (460 sq.m) at Ground Floor level and Medical Consultant suites on part Ground Floor and First to Fourth Floor (3,266 sq.m), and necessary amendments: (1) Addition of AHUs and auxiliary plant services at Roof Level with 2.0 m high surrounding metal louver screening as indicated to match existing in colour and material specification; 2) Reposition glazed door in existing Ground commercial glazing unit and opaque film added to back of glazing units as indicated. 3) Replace signage to match existing in material specification and detail; 4) Provision of Waste Storage facilities at Ground Floor Level; 5) Amended layout to waste storage area at Basement level with a reduction of 2 no. car parking spaces to provide total of 14 no. car parking spaces; and 6) Addition of bicycle parking spaces at Basement level to provide a total of 30 no. spaces and 7) All ancillary and associated site works.
Planning permission for change of use of ground floor unit (50 sq.m) from retail to cafe at 110 Amiens Street, Dublin 1.
The brief summarizes the pattern across all 12,913 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 3284/24The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief