Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 12,589 decisions within 5 km, 5 exact-site or onsite candidate records, and 2173 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2173 structured nearby appeal records.
2,173 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
The Board of St. James's Hospital intends to apply for planning permission for development in the courtyard to the north of the Bone Marrow Treatment Unit, Phase 1F, St. James's Hospital, James's Street, Dublin 8, D08 A978. The development will consist of the construction of a single storey 4.9m high extension (212 sq. m.) to the Bone Marrow Treatment Unit to accommodate 4 no. acute leukaemia hospital ward treatment units; a link corridor to the existing Bone Marrow Treatment Unit (a further 18 sq. m.); roof top plant equipment with 1.4m high screen; and all other site development works above and below ground required to facilitate the development, all at podium level within the adjacent courtyard.
The development will consist of replacement/demolition of a temporary storage unit of 4.15m2 and the erection of a single storey building of 221m2, 41.15 metre high, to accommodate Clinical Supply Facilities, a patient reception area including linked access to the existing hospital corridors, plant equipment and all other site development works, above and below ground required to facilitate the development, all at podium level within Courtyard 12, Phase 1C of the Main Hospital Block. This proposed development is to facilitate the reconfiguration of the Cardiac Catheterisation Laboratory and associated departments.
The development will consist of a proposed single storey rear extension plus attic conversion with dormer roof to rear roof slope and 3 number velux rooflights to front roof slope plus internal alterations and all associated site works.
Planning permission for refurbishment and extension to 67, James's Walk. The works will include the provision of new mezzanine floor extending into the existing roof space providing a new habitable room, with a new large dormer constructed to the rear beneath the existing ridge line. Refurbishment works include reducing the level of ground floor, alterations and renovations to the existing house and all ancillary site works.
RETENTION: The development will consist of: Retention of extensions and alterations to an existing dwelling house, increase in height of existing boundary and associated site development works.
PERMISSION & RETENTION. The Board of St James’s Hospital intends to apply for planning permission and retention permission for development at this site, St James’s Healthcare Campus, St James’s Street, Dublin 8. The development for which planning permission is sought will consist of a 55 sq. m. single storey extension to the Burns Unit to accommodate a dayroom and staff office. The development for which retention permission is sought consists of an 81.8 sq. m. elevated plant room erected to the west of the Burns Unit and a service bridge extension to the Burns Unit.
The brief summarizes the pattern across all 12,589 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 3327/21The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief