Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Courtyard to the north of the Bone Marrow Treatment Unit, Phase 1F the Main Hospital, St. James's Hospital, James's Street, Dublin 8, D08 A978

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The preview found 12,295 nearby planning records within 5 km where a location match is available.

Matched source
3327/21
Project type
One-off house
Coverage
5 km radius
12,295Nearby applications
13%Refused
10,698Conditional grants
2Refusal reasons

Top refusal reasons nearby

Design1
Visual Amenity1

Nearest similar decisions

3327/21

The Board of St. James's Hospital intends to apply for planning permission for development in the courtyard to the north of the Bone Marrow Treatment Unit, Phase 1F, St. James's Hospital, James's Street, Dublin 8, D08 A978. The development will consist of the construction of a single storey 4.9m high extension (212 sq. m.) to the Bone Marrow Treatment Unit to accommodate 4 no. acute leukaemia hospital ward treatment units; a link corridor to the existing Bone Marrow Treatment Unit (a further 18 sq. m.); roof top plant equipment with 1.4m high screen; and all other site development works above and below ground required to facilitate the development, all at podium level within the adjacent courtyard.

Granted0.0 km07 October 2021
2281/20

The development will consist of replacement/demolition of a temporary storage unit of 4.15m2 and the erection of a single storey building of 221m2, 41.15 metre high, to accommodate Clinical Supply Facilities, a patient reception area including linked access to the existing hospital corridors, plant equipment and all other site development works, above and below ground required to facilitate the development, all at podium level within Courtyard 12, Phase 1C of the Main Hospital Block. This proposed development is to facilitate the reconfiguration of the Cardiac Catheterisation Laboratory and associated departments.

Granted0.1 km21 April 2020
3313/25

The development will consist of a proposed single storey rear extension plus attic conversion with dormer roof to rear roof slope and 3 number velux rooflights to front roof slope plus internal alterations and all associated site works.

Granted0.1 km11 November 2025
5182/22

Planning permission for refurbishment and extension to 67, James's Walk. The works will include the provision of new mezzanine floor extending into the existing roof space providing a new habitable room, with a new large dormer constructed to the rear beneath the existing ridge line. Refurbishment works include reducing the level of ground floor, alterations and renovations to the existing house and all ancillary site works.

Granted0.1 km10 January 2023
2334/19

RETENTION: The development will consist of: Retention of extensions and alterations to an existing dwelling house, increase in height of existing boundary and associated site development works.

Granted0.1 km16 April 2019
WEB5451/25

PERMISSION & RETENTION. The Board of St James’s Hospital intends to apply for planning permission and retention permission for development at this site, St James’s Healthcare Campus, St James’s Street, Dublin 8. The development for which planning permission is sought will consist of a 55 sq. m. single storey extension to the Burns Unit to accommodate a dayroom and staff office. The development for which retention permission is sought consists of an 81.8 sq. m. elevated plant room erected to the west of the Burns Unit and a service bridge extension to the Burns Unit.

Granted0.1 km10 December 2025

The full report covers all 12,295 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required