Free preview / €39 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

The report your architect will ask for — here is how it compares with a €49 pre-planning report.
PlanIntel briefPlanningCheck
Price€39 incl. VAT€49
Nearby decisionsUp to 80 detailed (40 refusals + 40 grants)Not stated
AI planning chat5 messages/day freeNone
Saved-site alertsFreeNone
Courtyard to the north of the Bone Marrow Treatment Unit, Phase 1F the Main Hospital, St. James's Hospital, James's Street, Dublin 8, D08 A978Opens secure checkout for the €39 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€39 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Courtyard to the north of the Bone Marrow Treatment Unit, Phase 1F the Main Hospital, St. James's Hospital, James's Street, Dublin 8, D08 A978

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The site check found 12,589 decisions within 5 km, 5 exact-site or onsite candidate records, and 2173 structured appeals.

Matched source
3327/21
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.

Applications tied to the site

Partial coverage

5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

5 matched

Zoning and settlement

Partial coverage

1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.

1 matched

Rural-housing policy

Not yet covered

No verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.

Flood, heritage, ecology and archaeology

Partial coverage

2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.

2 matched

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

2173 structured nearby appeal records.

2,173 matched

Current policy citations

Confirmed coverage

Citations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.

1 matched
12,589Nearby applications
5Site-linked candidates
13%Nearby refused
2,173Structured appeals

Top refusal reasons nearby

Residential Amenity2
Traffic Sightlines1
Visual Amenity1

Nearest planning decisions

3327/21

The Board of St. James's Hospital intends to apply for planning permission for development in the courtyard to the north of the Bone Marrow Treatment Unit, Phase 1F, St. James's Hospital, James's Street, Dublin 8, D08 A978. The development will consist of the construction of a single storey 4.9m high extension (212 sq. m.) to the Bone Marrow Treatment Unit to accommodate 4 no. acute leukaemia hospital ward treatment units; a link corridor to the existing Bone Marrow Treatment Unit (a further 18 sq. m.); roof top plant equipment with 1.4m high screen; and all other site development works above and below ground required to facilitate the development, all at podium level within the adjacent courtyard.

Granted0.0 km07 October 2021
2281/20

The development will consist of replacement/demolition of a temporary storage unit of 4.15m2 and the erection of a single storey building of 221m2, 41.15 metre high, to accommodate Clinical Supply Facilities, a patient reception area including linked access to the existing hospital corridors, plant equipment and all other site development works, above and below ground required to facilitate the development, all at podium level within Courtyard 12, Phase 1C of the Main Hospital Block. This proposed development is to facilitate the reconfiguration of the Cardiac Catheterisation Laboratory and associated departments.

Granted0.1 km21 April 2020
3313/25

The development will consist of a proposed single storey rear extension plus attic conversion with dormer roof to rear roof slope and 3 number velux rooflights to front roof slope plus internal alterations and all associated site works.

Granted0.1 km11 November 2025
5182/22

Planning permission for refurbishment and extension to 67, James's Walk. The works will include the provision of new mezzanine floor extending into the existing roof space providing a new habitable room, with a new large dormer constructed to the rear beneath the existing ridge line. Refurbishment works include reducing the level of ground floor, alterations and renovations to the existing house and all ancillary site works.

Granted0.1 km10 January 2023
2334/19

RETENTION: The development will consist of: Retention of extensions and alterations to an existing dwelling house, increase in height of existing boundary and associated site development works.

Granted0.1 km16 April 2019
WEB5451/25

PERMISSION & RETENTION. The Board of St James’s Hospital intends to apply for planning permission and retention permission for development at this site, St James’s Healthcare Campus, St James’s Street, Dublin 8. The development for which planning permission is sought will consist of a 55 sq. m. single storey extension to the Burns Unit to accommodate a dayroom and staff office. The development for which retention permission is sought consists of an 81.8 sq. m. elevated plant room erected to the west of the Burns Unit and a service bridge extension to the Burns Unit.

Granted0.1 km10 December 2025

The brief summarizes the pattern across all 12,589 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€39 incl. VAT once-off PDF, no account required