Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 5,140 decisions within 5 km, 1 exact-site or onsite candidate record, and 527 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
527 structured nearby appeal records.
527 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Permission for development at a c. 2.83 hectare site at former Georgia Pacific Facility at McKee Avenue, Finglas, Dublin 11. The proposed development will consist of the demolition of a c. 1,732 sq.m. part single storey part two storey office building facing McKee Avenue which was formally part of the Georgia Pacific facility. The proposed development will also provide for a reconfiguration of car parking spaces at the entire former Georgia Pacific facility resulting in a revised provision of 44 car parking spaces overall. Permission is also sought for all ancillary site services and landscape works necessary to facilitate the proposed development.
RETENTION & PERMISSION: A. Retention of a single storey extension to side and rear(currently under construction) and further planning permission for B. New vehicular access gates to front and dishing of footpath to accommodate same, C. All associated site works.
Permission to install a 1.8m x 1.42m x 0.51m (HxWxL) above ground natural gas pressure reduction cabinet and an accompanying 3.25m high vent stack with all ancillary services and associated site works.
The proposed Development will consist of first floor partial demolition to form openings in the gable end wall to the side of existing house and proposed construction of a new first floor extension over existing single storey extension to the side and rear of the existing house with pitched roof. Proposed new extension comprising new bedroom with en-suite shower room, home study and shower room. Proposed minor internal modifications and decoration to the existing house and associated site ancillary works.
Planning permission for development at this site (2.61ha) at Building C, Jamestown Business Park, Finglas, Dublin 11. The development will consist of alterations to the western elevation of the existing industrial warehouse building (known as Building C) comprising the creation of 4 no. openings (1 no. opening to facilitate a 4.25m wide x 4.35m high aluminium roller door and the remaining 3no. openings to facilitate the provision of 3 no. loading bays with associated dock levellers, dock shelters and ramp access). Planning permission is also sought for the removal of existing boundary fencing and access gate and the installation of new galvanised steel security boundary fencing (2.45m high) including a new entrance gate (6.4m wide x 2.45m high) at the northern entrance of the site and new internal access gate to the west of existing entrance gate.
The development consists of the construction of a new attic conversion with alterations to the existing hipped roof forming a new gable wall with high level window to the side elevation & new flat roof dormer to the rear elevation at roof level. The development is to include internal alterations; landscaping and all ancillary site works and drainage as necessary.
The brief summarizes the pattern across all 5,140 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 3329/20The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief