Free preview / €39 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

The report your architect will ask for — here is how it compares with a €49 pre-planning report.
PlanIntel briefPlanningCheck
Price€39 incl. VAT€49
Nearby decisionsUp to 80 detailed (40 refusals + 40 grants)Not stated
AI planning chat5 messages/day freeNone
Saved-site alertsFreeNone
17, Greenwood Avenue, Dublin 13Opens secure checkout for the €39 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€39 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

17, Greenwood Avenue, Dublin 13

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

8% of nearby decided applications were refused. The site check found 5,246 decisions within 5 km, 6 exact-site or onsite candidate records, and 656 structured appeals.

Matched source
3365/19
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.

Applications tied to the site

Partial coverage

6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

6 matched

Zoning and settlement

Partial coverage

1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.

1 matched

Rural-housing policy

Not yet covered

No verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.

Flood, heritage, ecology and archaeology

Partial coverage

2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.

2 matched

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

656 structured nearby appeal records.

656 matched

Current policy citations

Confirmed coverage

Citations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.

1 matched
5,246Nearby applications
6Site-linked candidates
8%Nearby refused
656Structured appeals

Top refusal reasons nearby

Visual Amenity29
Residential Amenity28
Design22
Zoning Contravention22
Traffic Sightlines14

Nearest planning decisions

3365/19

The development consists of the following: 1. Demolition of single storey extension to side of existing dwelling house, 2. Permission for 2 dwelling houses (1 3-bedroom and 1 2-bedroom) attached to existing dwelling house providing for terrace of 3 dwelling on site, 3. Alterations to existing vehicular entrance and new vehicular entrances to access all 3 dwellings on site and all associated site development works.

Granted0.0 km18 December 2019
WEB1977/23

Proposed works include conversion of the attic space and construction of a side dormer roof window to the existing hipped roof plane. All to create space within the attic for storage and a study. Plus all associated site works

Granted0.0 km10 January 2024
WEB1406/23

The proposed works include construction of a side dormer window with hip and gable window to the existing side roof plane, all to create space to convert attic for extra storage and a family playroom.

Granted0.1 km07 July 2023
WEB1413/21

Retention permission sought for: a. Retain two rear single storey extensions to dwelling house. b. Retain single storey garden room (home gym, as existing use is ancillary to the enjoyment of the house) to rear garden. c. Retain pedestrian gateway to side/rear boundary wall. d. Retain gable roof of first floor rear bedroom extension.

Granted0.1 km11 June 2021
WEB1212/25

The conversion of the attic space to storage. The development will include the construction of a dormer window to the rear / east pitched roof and change to the existing hipped roof to the side / north pitched roof to a gable end roof with a new window into the new gable wall.

Granted0.1 km28 March 2025
WEB1449/21

Proposed roof dormer to rear part of roof and rooflight to front part of roof with associated internal alterations to dwelling house

Granted0.1 km18 June 2021

The brief summarizes the pattern across all 5,246 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€39 incl. VAT once-off PDF, no account required