Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 9,808 decisions within 5 km, 4 exact-site or onsite candidate records, and 1244 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1244 structured nearby appeal records.
1,244 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Planning permission is sought for: 1. The extension of existing dressing rooms to provide new single storey dressing room/multipurpose room. 2. Provision of two storey extension to front of existing clubhouse to facilitate new accessible lift shaft and lobby. 3. Internal alterations including partial conversion of existing plant room to facilitate new accessible WC. 4. Alterations to clubhouse façade at ground floor. 5. Provision of new all-weather surface to rear of clubhouse and all associated site works, including new accessible ramps.
Planning permission for additional/dual use to allow for partial Montessori/childcare use as well as the existing use as clubhouse at ground floor level.
Planning permission is sought for the following development: (i) The construction, to the rear and side of a small extension to ground and first floor (13 sqm) and a shed (12 sqm) for bicycles and bins; the removal of chimney stack and revisions to existing roof pitch; new canopy at front entrance, changes to the fenestration to the front, rear and side, including obscure glazing to stairwell and additional and redesigned windows on the ground and first floor; (ii) Change of use, and internal redesign, of eight bedroom bed and breakfast establishment to a home care community care facility and which includes consulting rooms, training rooms, a meeting room and offices; (iii) The creation of private open space and four car parking spaces. The proposed development also includes all associated site development works including signage, a side boundary wall to the front and drainage.
The development consists of the construction of the following; 1. A Storm Porch extension at the front of the house, (South Elevation). 2. A single storey extension at rear of house, (North Elevation) containing Kitchen, Living and Utility areas. 3. A detached single storey cabin Building for storage/ home office and ancillary domestic use located in the rear garden area. 4. Internal alterations to house and all associated site works.
Planning permission for attic conversion with hip to gable roof and dormer to rear roof to accommodate stairs to allow access to attic conversion as non habitable storage space with roof windows to front, gable window to side all with associated ancillary works
The development consists of the construction of a new 3m wide dormer window facing rear garden at attic level, new rooflights to rear and sides & all necessary site works to facilitate the development.
The brief summarizes the pattern across all 9,808 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 3405/22The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief