The development will consist of a free standing single storey ESB sub-station and MV switch room (approx. 63 sq m) to the side boundary of the site, (northern boundary) and all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Summerhill Dublin Bus Depot, Mountjoy Place, off Mountjoy Square, Summerhill, Dublin 1
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 12,641 nearby planning records within 5 km where a location match is available.
- Matched source
- 3434/22
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Planning permission for material change of use from cafe use to office use with consulting rooms, including internal alterations in fitting out the existing grey box space and new signage. The works consist of alterations to the existing grey box space to provide an office with consulting rooms, including new finishes to existing walls and floors, new stud partitions and ceilings and associated mechanical and electrical installations. Signage to include a privacy band across the full length of the front glazed elevation in the form of a grey manifestation 1.6m high and orange Jigsaw logo and lettering to the glazing pane on the left of the existing entrance doors and a separate projected sign of 6mm powder coated metal with orange Jigsaw logo supported off 50mm black powerder coated support bars.
PROTECTED STRUCTURE. PERMISSION & RETENTION. The development will consist of restoration and preservation works to the brick facades including repair, re-pointing, and consolidation of the brickwork, rendering in lime plaster to the rear return, the cleaning and the re-pointing of the front steps, the repair of the railings to the front, retiling of the entrance hall and replacement of rainwater goods and doors to basement. Retention permission is sought for the installation of internal linings to the basement and ground floor level return walls and ceilings, including breathable insulation and plasterboard to basement walls internal walls.
A) A small single and two story flat roof extension to the rear B) Attic conversion to include roof windows to the front roof slope and a hipped roof dormer to the rear C) Alterations to the front elevation, Internal modifications and associated site work
PROTECTED STRUCTURE: Planning permission for the following works at third and second floor levels: - Relocating the present bathroom to the centre of the third floor apartment and providing a conservation rooflight thereto; - Relocating the present kitchen to the front of the apartment thereby allowing its enlargement and fitting new storage units; - Reordering bedroom 1 and providing a new entrance thereto; - Re-ordering bedroom 2 and providing a single separate entrance thereto; - Taking down existing panelled doors for repair and reinstatement throughout; - Construction of hall storage unit; - Provision of storage units in bedrooms 1 and 2; - Provision of new sanitary and electrical services throughout; - Fitting new floorcovering and decoration throughout; Retention of 30 minute fire screen and glazed door at second floor landing, at 20 Mountjoy Square, Dublin 1 - A Protected Structure (RPS 5441).
RETENTION planning permission for single storey extension to rear of existing all with associated ancillary works.
The full report covers all 12,641 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 3434/22The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report