Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 7,742 decisions within 5 km, 3 exact-site or onsite candidate records, and 848 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
848 structured nearby appeal records.
848 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
The development will consist of the construction of new single storey pitched roof side extension and new single storey flat roof side and rear extension. Part of the extension will provide Ancillary Family Accommodation (granny flat). Other works include (1) Demolition of existing shed; (2) Rooflights within rear extension flat roof; (3) Connections to all services and; (4) All necessary ancillary site development works to facilitate this development.
Permission to widen existing pedestrian entrance to create a new vehicular entrance with kerb dishing to facilitate off street parking for one car.
PERMISSION: The development will consist of the following elements:- 1. Demolition of an existing single storey flat roof extension to the rear of the existing terraced dwelling. 2. The construction of a new 2 storey extension to the rear of the existing dwelling, comprising, (a) A 28.8 sq.m ground floor extension with part flat roof and rooflight and (b) A 13.6 sq.m first floor extension with pitched slate roof to match existing, with new rooflight. 3. Alterations to internal layout and associated site and drainage works.
The development will consist of a rear pedestrian entrance, a ground floor bay window, a porch extension, a two storey rear extension and a rear roof dormer.
PERMISSION: For vehicular access.
RETENTION: The development to be retained consists of the provision of a means of access to the rear from the existing laneway.
The brief summarizes the pattern across all 7,742 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 3510/19The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief