PROTECTED STRUCTURE: PERMISSION: The development will consist of the repairs and renovations of the existing dwelling (protected structure). The works will include the following 1) Repair & refurbish the front external entrance door, 2) repair of existing roof, gutters and downpipes 3) provision of new timber sash windows and external doors which have been damaged / removed, 4) partial construction and refurbishment of the stairs from ground floor level to first floor level, 5) repair of fire damaged ceiling at basement level and water damaged ceiling at ground and first floor level and 6) all ancillary site development works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
39, North Circular Road, Dublin 7, D07 TK22
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 11,325 nearby planning records within 5 km where a location match is available.
- Matched source
- 3512/23
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
The development consists of the following works, planning permission for a) subdivision of existing rear garden of 50 North Circular Road, Dublin 7, b) removal of existing rear garden shed c) provision of a 3 bedroom, 2 storey mews dwelling with off street parking for 1 car along with all associated site development and facilitating works.
PROTECTED STRUCTURE: PERMISSION & RETENTION: Planning Permission is sought for the following: removal of existing concrete apron to front garden and installation of new historic style railings and pedestrian gate on granite plinth as boundary to front garden area, new hedge and soft landscaping, new granite pathway and gravel finish, new timber bin store with planted roof. To the rear permission is sought to break down window cill to lower ground floor window to create new door opening, and to fit new roller shutter gate to secure proposed vehicular rear access parking at bottom of rear garden. Retention permission is requested for the following; removal of section of non-original concrete blockwork to rear boundary wall to create vehicular rear access off existing lane, replacement of previous timber access stairs to rear garden with new raised deck and access stairs, and replacement of non-original PVC window and timber door with new hardwood French door and window.
PROTECTED STRUCTURE: PERMISSION: The development will consist of repairs and renovations of the Existing two-storey dwelling(Protected Structure). The works will include 1)Repair and refurbishment of damaged walls, floors, ceilings, and windows at all levels; 2)Relocation of the basement kitchen to the ground floor; 3)Construction of a 2m² WC within Bedroom 1 at basement level; 4) Change of use the basement storage into a bathroom, including all associated drainage and site works.
PROTECTED STRUCTURE: The proposed development will consist of the removal of the new masonry boundary wall constructed on the boundary between No.68 / 66 North Circular Road and replacing it with a set of fixed, painted metal railings; To provide a new set of new railings and gates to delineate the boundary between the front garden area and the public pavement. No works are proposed to the exterior or interior of the existing house. The works the subject of this application are located within the grounds of a Protected Structure (RPS Ref. No.1584).
(1.) The Construction of a Two-Bedroom, Two-Storey Mews House (2.) Provision of private amenity spaces: Ground-floor terrace, 1 No. First-floor Balcony, Street facing. (3.) The provision of pedestrian access via, O'Devaney Gardens (4.) SuDS and foul drainage, landscaping, boundary treatments and all associated works necessary to facilitate the development.
Source match
Matched from public planning record 3512/23The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report